Waste Management Services for RWS
Sector: Waste Processing and Treatment • Location: Georgia, United States
END DATE EXTENDED 12/19/2025 Pursuant to the State Purchasing Act (Official Code of Georgia Annotated §§50-5-50 et seq.), this electronic Request for Quotes ("eRFQ") is being issued to establish a contract with one or more qualified suppliers who will provide Waste Management Services to the Georgia Vocational Rehabilitation Agency (hereinafter, "the State Entity") as further described in this eRF
- Status
- Closed
- Sector
- Waste Processing and Treatment, Biomass, Warehouse
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Waste Management Services for RWS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | END DATE EXTENDED 12/19/2025 Pursuant to the State Purchasing Act (Official Code of Georgia Annotated §§50-5-50 et seq.), this electronic Request for Quotes ("eRFQ") is being issued to establish a contract with one or more qualified suppliers who will provide Waste Management Services to the Georgia Vocational Rehabilitation Agency (hereinafter, "the State Entity") as further described in this eRFQ. The contractor shall provide routine solid waste collection and disposal services for the following containers: Container Size: 8-yard container, 6-yard container, 4-yard container, 30-yard roll-off container Quantity: 4 (8 yd), 1 (6 yd), 2 (4 yd), 1 (30 yd roll-off) Frequency: 8-yard, 6-yard, and 4-yard twice per week; 30-yard roll-off twice per month Location/Use: 8-yard located in designated high-volume buildings. 4-yard located in designated medium-volume areas, 6-yard located in low-volume facilities, and 30- yard located in maintenance/warehouse facility. Container Requirements 1. The contractor shall supply, install, and maintain all containers. 2. Containers shall be leakproof, rust-resistant, and equipped with tight-fitting lids to prevent littering, animal access, and odor. 3. All containers must be clearly labeled with the vendor¿s company name and customer service contact number. 4. Containers must be positioned as directed by GVRA Facilities Operations to allow for safe truck access and pedestrian clearance. 5. Contractor shall clean, repaint, or replace containers as needed to maintain a professional and sanitary appearance. |
Original sector | Services |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Biomass, Warehouse |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
