logo

Wastewater Thickening Room Drain Pipe Replacement

One of 2,790 tenders Taiyo tracks in New Hampshire.

Source: New Hampshire Purchasing Group

Tender
Closed

The Contractor shall furnish all labor , materials , equipment , and installation necessary for the replacement of the existing drain system serving the Thickening Room , located in the Process Building basement . The existing piping , originally installed circa 1988 , has failed and requires full replacement . The work

Status
Closed
Sector
Water Supply and Storage, Metal, Steel, Commercial
Location
New Hampshire, United States of America
Updated
3 Nov 2026
Source
New Hampshire Purchasing Group

ConstructChat

Ask ConstructChat about Wastewater Thickening Room Drain Pipe Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Wastewater Thickening Room Drain Pipe Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to New Hampshire, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Contractor shall furnish all labor , materials , equipment , and installation necessary for the replacement of the existing drain system serving the Thickening Room , located in the Process Building basement . The existing piping , originally installed circa 1988 , has failed and requires full replacement . The work involves multiple constraints and complexities , as outlined herein . The existing drain piping is ductile iron and is located approximately 13 feet above the floor . Process pumps are located directly below the project area , with additional piping , valves , and electrical conduit in close proximity . The Thickening Room and associated systems shall remain operational throughout the duration of the project . Any required shutdowns shall be minimized and shall be coordinated in advance with Wastewater Treatment Facility staff . The Contractor shall be solely responsible for providing all necessary scaffolding , rigging , and access equipment required to safely access , remove , and reinstall the piping . The Contractor shall carefully consider the safe removal of the existing piping . The piping is heavy and contains years of accumulated debris , as documented in the accompanying photographs . Removal shall be performed in controlled sections and with appropriate protective measures to prevent damage to equipment , piping , and facilities located below . Replacement piping shall be Schedule 80 PVC . The system shall consist of one ( 1 ) continuous 6 - inch diameter main run approximately 110 linear feet in length . The overall system shall also include thirteen ( 13 ) inlet pipes , each 4 inches in diameter , six ( 6 ) 4 - inch vent pipes , and two ( 2 ) 2 - inch vent pipes . There is a total of twelve ( 12 ) cleanouts throughout the piping system to be reinstalled , as marked . All piping supports and hangers shall be installed in accordance with applicable codes and standards . Hanger material shall be stainless steel . A copy of the 1988 Secondary Upgrade Plans , Sheet P - 8 , is provided , with the piping to be replaced clearly identified . All measurements are the responsibility of the Contractor to be confirmed in the field . The Contractor shall be responsible for the proper disposal of all removed materials and existing piping . Upon completion of the work , the Contractor shall leave the project area clean and free of debris . Cleaning shall include , but not be limited to , floors , piping surfaces , walls , and doors . The area is subject to inspection before City staff will approve project completion .

Location

Country

United States of America (USA)

State

New Hampshire

Source

Source

New Hampshire Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Metal, Steel, Commercial

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender