logo

Wastewater Treatment Plant Perimeter Security Fence Replacement

One of 10,000+ tenders Taiyo tracks in California.

Source: California Purchasing Group

Tender
Closed

The Carmel Area Wastewater District ( Carmel by the Sea , CA ) is hereby seeking Bids from qualified fencing contractors to perform site preparation , clearing and grubbing , debris removal , and construction of a new security fence around the CAWD wastewater treatment plant ( WWTP ). The work is being done to re

Status
Closed
Sector
Water Supply and Storage, Cement
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Wastewater Treatment Plant Perimeter Security Fence Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Wastewater Treatment Plant Perimeter Security Fence Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Carmel Area Wastewater District ( Carmel by the Sea , CA ) is hereby seeking Bids from qualified fencing contractors to perform site preparation , clearing and grubbing , debris removal , and construction of a new security fence around the CAWD wastewater treatment plant ( WWTP ). The work is being done to reduce the risk to District staff , equipment , and infrastructure and provide a sufficient security barrier for the WWTP . A . Install best management practices ( BMPs ) including filter fabric fencing and catch inlet protection . B . Remove and dispose of existing security fence , concrete footings , and all construction debris around WWTP perimeter . C . Clear and grub ten - foot - wide area around fence alignment per specifications , removing excess dirt , importing backfill and compacting as needed . D . Survey the alignment of the new security fence per plans . E . Construct approximately 2 , 200 linear feet of new eight - foot - tall chain - link security fence , vehicle and pedestrian gates , and frog exclusion fencing , along surveyed alignment per plans and specifications . F . Construct approximately 200 linear feet of new twelve - foot - tall chain - link security fence and frog exclusion fencing along surveyed alignment per plans and specifications . G . Install approximately 1 , 900 linear feet of vertical HDPE privacy fence slats with a 75 % privacy factor in owner - selected color . H . Roughen soil as needed and apply soil stabilization ( hydroseeding ). The perimeter Eucalyptus trees have already been removed and the trunks have been stump ground . The debris from the Eucalyptus tree removal has been offhauled , but some amount of stump grindings remain . The above - grade portion of the existing perimeter fence has been largely demolished as part of the tree removal work but has not been offhauled . No temporary security fencing is needed during construction of the replacement permanent security fence .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Cement

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender