Water Park Management
The scope, dates and status of this tender. A free account opens every field.
Source: Missouri Purchasing Group
1 . Set up and prepare for usage of all movable equipment , including tables , chairs , lounges , lifeguard chairs , diving boards , etc . 2 . Clean , inspect and prepare vacuuming equipment . 3 . Power wash the entire deck prior to placing deck furniture . 4 . Inspect and prepare all hoses . 5 . Check and clean all
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Water Park Management
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Set up and prepare for usage of all movable equipment , including tables , chairs , lounges , lifeguard chairs , diving boards , etc . 2 . Clean , inspect and prepare vacuuming equipment . 3 . Power wash the entire deck prior to placing deck furniture . 4 . Inspect and prepare all hoses . 5 . Check and clean all gutters and drains , including gutter covers . 6 . Drain and acid wash pools . 7 . Secure all grates . 8 . Ensure all hydrostatic relief valves are operating correctly prior to filling the pools . 9 . Fill pools . 10 . Check diving boards , place lifeguard chairs , clean and place furniture . 11 . Check and test equipment , i . e . chemical feeders , etc . and report status to City . 12 . Check all pumps and motors to the attractions : slides , spray features , leisure playground , etc . 13 . Clean pool area within the pool enclosures . 14 . Remove and store all plugs from plumbing on site to be used the following season . 15 . Recirculate water through filtration system . 16 . Furnish , store , and inject necessary chemicals for operation of the pools . 17 . Backwash filters and check for any defects . 18 . Have pools ready for operation at least ten ( 10 ) days before opening day . 19 . Report to City all operation deficiencies . 20 . Be responsible for checking out and handling of facility keys to staff . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
