logo

Water Pollution Control Authority - RFQ - WWTP Value - Engineering Services

Sector: Water Supply and Storage • Location: Connecticut, United States of America

Source: Connecticut Purchasing Group

Tender
Closed

The City of Derby WPCA , through this Request for Qualifications ( RFQ ) is seeking qualification statements from professional engineering consulting firms to provide Value Engineering ( VE ) services for the proposed city of Derby WPCA Wastewater Treatment Plant Comprehensive Upgrades Project . Anticipated Scope of Serv

Status
Closed
Sector
Water Supply and Storage, Government
Location
Connecticut, United States of America
Updated
3 Nov 2026
Source
Connecticut Purchasing Group

ConstructChat

Ask ConstructChat about Water Pollution Control Authority - RFQ - WWTP Value - Engineering Services

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Water Pollution Control Authority - RFQ - WWTP Value - Engineering Services” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Connecticut, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The City of Derby WPCA , through this Request for Qualifications ( RFQ ) is seeking qualification statements from professional engineering consulting firms to provide Value Engineering ( VE ) services for the proposed city of Derby WPCA Wastewater Treatment Plant Comprehensive Upgrades Project . Anticipated Scope of Services The anticipated scope of services for the VE Review Team shall consist of the following : 1 . Review the documents provided by the City . 2 . Identify a VE Facilitator to lead a VE Workshop for the consultant . 3 . Conduct a site visit to better understand the design philosophy being used and any constructability issues . 4 . The consultant ’ s VE team will participate in a workshop to study the 30 % preliminary design drawings of the proposed WWTP Upgrades . 5 . The VE Team will participate in an evaluation of the following focus areas : a . Construction Phasing to maximize Maintenance of Plant Operations b . Identify and evaluate potential alternative concepts with concept level OPCC , c . Opinion of Probable Construction Cost ( OPCC ) d . Other focus areas agreed upon by the City 6 . Be responsible for coordinating all communications between the VE Team and the City . 7 . Conduct three ( 3 ) VE workshops or meetings discussing : a . 30 % preliminary design drawings b . Basis of Design Report c . Continuation of VE workshop topics ( a and b ) 8 . It is anticipated that the workshops will be single - day sessions and scheduled to be conducted in the spring of 2026 depending on the selected firm ’ s availability . 9 . Representatives from the City of Derby WPCA , and Weston & Sampson will participate in each workshop . Weston & Sampson will make a presentation of the materials to be reviewed and provide a summary of the project at the initial workshop . 10 . Two ( 2 ) follow - up workshops will be conducted to discuss the VE Team findings . 11 . Workshops will be conducted in person at City Hall .

Location

Country

United States of America (USA)

State

Connecticut

Source

Source

Connecticut Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Government

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender