Water Slide Maintenance for Carlsbad Water Park
Closed · New Mexico · Last reported Nov 2025
Source: New Mexico Purchasing Group
• Inspect and repair all fiberglass in the slide path , which will include chips , gouges , and spider cracks . • All joints will be inspected and realigned where necessary . • Previously identified seams will be cleaned andre - caulked . • All slide interiors will be cleaned , polished , and waxed , including the encl
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- New Mexico, United States of America
- Updated
- 3 Nov 2026
- Source
- New Mexico Purchasing Group
ConstructChat
Ask ConstructChat about Water Slide Maintenance for Carlsbad Water Park
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | • Inspect and repair all fiberglass in the slide path , which will include chips , gouges , and spider cracks . • All joints will be inspected and realigned where necessary . • Previously identified seams will be cleaned andre - caulked . • All slide interiors will be cleaned , polished , and waxed , including the enclosed drop slide interior . • Perform scale removal on aquatic play structure , as well as inner and outer surfaces . • Perform scale removal on all slides , including the start basin and end of the slides . • Contractor will realign and repair or replace slide plumbing and couplings as needed ; a lift will be provided at the request of the contractor if necessary . • Ensure all launch pads are firmly attached to tower platforms . • Inspect and tighten all hardware connecting slides to support beams . Where necessary , replace missing hardware . • When required or necessary and agreed upon by the customer , paint the exteriors of slides . • Preferred but not required , NARSSO - certified inspector able to provide an inspection report for state - required permitting . • Contractor will be responsible for all labor , equipment , and materials required to complete the scope of work . • The City desires an on - going maintenance agreement for a one ( 1 ) year period , with option to extend for up to three ( 3 ) additional years for a total of four ( 4 ) years . |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | New Mexico Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
