logo

Water Station 9 Valve Replacement

The scope, dates and status of this tender. A free account opens every field.

Source: MITN Purchasing Group

Tender
Closed

SCOPE A . This Section includes furnishing and installing water main systems . B . Reconnection of proposed water main and / or water service connections to existing water main and / or water service constructions shall be in conformance with requirements of this Section . C . This Section shall include furnishing ,

Status
Closed
Sector
Water Supply and Storage
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about Water Station 9 Valve Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Water Station 9 Valve Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

SCOPE A . This Section includes furnishing and installing water main systems . B . Reconnection of proposed water main and / or water service connections to existing water main and / or water service constructions shall be in conformance with requirements of this Section . C . This Section shall include furnishing , excavating , installing , testing , disinfecting , and backfilling all required water main pipe , water service pipes , water main appurtenances , water service , and other work incidental to the water main and / or water service installation unless specifically included under other Items . D . This work shall also consist of providing as - constructed plans of the completed work . CONTRACT WORK A . Prior to the start of construction , the City of Kalamazoo shall be given the opportunity to provide construction services for any and all portions of the water main construction . The City of Kalamazoo shall submit an estimated cost to perform the work or will issue a bill based on time and material costs . A separate contract with the City of Kalamazoo will be needed for work to be performed by the City of Kalamazoo . 1 . City of Kalamazoo shall perform all water main taps in the water system , unless otherwise directed by the Engineer . B . The City of Kalamazoo Department of Public Services must approve the Contractor who will perform water main installation . A reference list of at least five ( 5 ) Type 1 supply water main projects completed by the Contractor shall be submitted in support of the Contractor ’ s qualifications . The Department of Public Services maintains a list of Contractors approved for water main installation and can be contacted to receive a current copy of that list . C . The Contractor ( when hired by the City ) or Developer ( when the Contractor is hired to perform work by the Developer ), shall provide a written statement of warranty ( Warranty Bond ) for a period of 2 years from the date of final acceptance for water main work or after meter is installed for water service work . Warranty work shall cover any necessary cost to repair water main or appurtenance leaks and water main or appurtenance leak damage at no cost to the City of Kalamazoo . Final acceptance on all water main and appurtenance work shall not occur until all items have been inspected by the Engineer , passed all required testing , as well as receipt and approval of all as built documents . Additionally , final acceptance on a water service will only be given once the water meter is installed . 1 . Water service or water main warranty work shall be completed either a prequalified contractor under the inspection of the City of Kalamazoo , or by City of Kalamazoo field service crews . All warranty work shall be paid for by the Developer or the Contractor . D . The Contractor is responsible for field locating all work which has not yet received final acceptance by the City of Kalamazoo . All damage to work that has not received final acceptance is the responsibility of the Contractor .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender