Water System Improvements to serve GA HWY 362 Connector
Bids closed Sep 2026 · Georgia · Last reported Aug 2026
Sealed Bids for the construction of the Water System Improvements to serve GA HWY 362 Connector will be received, by Pike County Water & Sewerage Authority, at 7818 US-19 South, Zebulon, Georgia 30295, until 11:00, Friday September 11, 2026, local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period
- Status
- Closed
- Sector
- Road, Power Transmission, Residential, Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Water System Improvements to serve GA HWY 362 Connector
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Sealed Bids for the construction of the Water System Improvements to serve GA HWY 362 Connector will be received, by Pike County Water & Sewerage Authority, at 7818 US-19 South, Zebulon, Georgia 30295, until 11:00, Friday September 11, 2026, local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Water System Improvements to serve GA HWY 362 Connector as shown on the construction drawings. In general, construction consists of Installation of approx. 3500 L.F. 10 PVC watermain, Fire Hydrants, Gate Valves, New Meter Services, erosion control and all associated measures for the complete project. Time allotted for completion of work is 60 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 74 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract. Copies of the Bidding Documents may be obtained from Watkins & Associates, LLC, 1606 Whiddon Mill Road, Tifton, Georgia 31793, (229) 388-8823 (Office of the Engineer), upon payment of a non-refundable fee of $300.00 (cash or check) or $309.00 (credit/debit card) for each set. Prospective Bidders may examine the Bidding Documents at the Pike County Water & Sewerage Authority, 7818 US-19 South, Zebulon, Georgia 30295, or at the Office of the Engineer at Watkins & Associates, LLC, Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. Upon receipt of the required payment, Watkins & Associates, LLC will transmit the digital Bidding Documents by electronic download link. The date the Bidding Documents are transmitted shall be considered the prospective Bidder's official date of receipt. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Road, Power Transmission, Residential, Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States
- Network Rail Commercial Property Maintenance Framework PSQ
- RFP - 2026-08-001
- SB011-27 822 Leonard Court Sinkhole Repair
- FREEDMAN GROVE ROAD ROADWAY IMPROVEMENTS
- RFP 26-20, On-Paving - Annual Contract
- SB013-26 Raised Intersections for Crogan Street at Perry Street and Clayton Street at Pike Street
- Road Work Bids- Resurface Macgruder Road
- Woodlawn Dr & Claxton Dairy Rd Roundabout
