WATER SYSTEM PERFORMANCE IMPROVEMENTS 1 ( WSPI - 1 )
The scope, dates and status of this tender. A free account opens every field.
Source: City of Truth or Consequences
The project includes the replacement and new installation of waterlines using open trench , and horizontal directional drilling ( HDD ) methods . Open trench construction consists of approximately 388 LF of 6 - inch C - 900 - DR - 18 PVC pipe , 4 , 905 LF of 8 - inch C - 900 - DR - 18 PVC pipe , 6 , 721 LF of 12 - inch
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Cement
- Location
- Truth or Consequences, New Mexico, United States of America
- Updated
- 3 Nov 2026
- Source
- City of Truth or Consequences
ConstructChat
Ask ConstructChat about WATER SYSTEM PERFORMANCE IMPROVEMENTS 1 ( WSPI - 1 )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project includes the replacement and new installation of waterlines using open trench , and horizontal directional drilling ( HDD ) methods . Open trench construction consists of approximately 388 LF of 6 - inch C - 900 - DR - 18 PVC pipe , 4 , 905 LF of 8 - inch C - 900 - DR - 18 PVC pipe , 6 , 721 LF of 12 - inch C - 900 - DR - 18 PVC pipe , and 2 , 997 LF of 14 - inch C - 900 - DR - 18 PVC pipe , and an approximately 220 LF of 12 - inch C - 900 DR - 18 FPVC waterlines installed by horizontal directional drilling . The replacement of the new water service lines , service lines , meters , hydrants , connections to the existing system and site work to include roadway asphalt removal and replacement . The project also includes Installation of Five ( 5 ) new concrete vault with new PRV ’ s which changes the water system configuration from a two - pressure zone system to a four - pressure zone to control pressure within a 35 to 95 psi design envelope range . All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6 ’ wide by 4 ’ deep trench . ( Base Bid includes Sheets CU - 228 to CU - 243 / CU - 244 to CU - 267 / CU - 270 to CU - 273 / CU - 628 ). ADDITIVE ALTERNATE 1 : The project includes replacement and new installation of approximately . , 140 LF of 8 - inch C - 900 - DR - 18 PVC pipe , 257 LF of 12 - inch C - 900 - DR - 18 PVC pipe . The project also included the replacement of the new water service lines , service lines , meters , hydrants , connections to the existing system and site work to include roadway asphalt removal and replacement . The project also includes Installation of two ( 2 ) new concrete vault with new PRV ’ s , and one ( 1 ) new PRV without concrete vault which changes the water system configuration from a two - pressure zone system to a four - pressure zone to control pressure within a 35 to 95 psi design envelope range . All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6 ’ wide by 4 ’ deep trench . ( Additive Alternate 1 Includes Sheets CU - 268 , and CU - 273 ). ADDITIVE ALTERNATE 2 : The project includes replacement and new installation of approximately . 202 LF of 6 - inch C - 900 - DR - 18 PVC pipe . The project also the replacement of the new water service lines , service lines , meters , hydrants , connections to the existing system and site work to include roadway asphalt removal and replacement . All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6 ’ wide by 4 ’ deep trench . ( Additive Alternate 2 Includes Sheets CU - 269 ). See more |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Truth or Consequences |
Source
Source | City of Truth or Consequences |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Cement |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
