Water Well Drilling Project At California Hotel
Sector: Water Supply and Storage • Location: Bujumbura, BI-BM, Burundi
Source: SAM.gov
Water Well Drilling Project at California Hotel. It includes, building, supplying, installation and all labor as required in the Statement of Work
- Status
- Closed
- Sector
- Water Supply and Storage, Hotel, Waste Processing and Treatment, Residential, Commercial
- Location
- Bujumbura, BI-BM, Burundi
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Water Well Drilling Project At California Hotel
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Water Well Drilling Project at California Hotel. It includes, building, supplying, installation and all labor as required in the Statement of Work |
Original sector | Construction |
Location
Country | Burundi |
State | BI-BM |
City | Bujumbura |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Hotel, Waste Processing and Treatment, Residential, Commercial |
Article published date | 2026-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Burundi
- Water Well Drilling Project At California Hotel
- Dcmr Master Bathroom Remodeling
- Resilient Karusi: Smart Irrigation and Rainwater Harvesting in Burundi
- Solar Energy in Local Communities: Travaux de construction d'un Centre National de Maintenance (Rez- de- Chaussée avec un dimensionnement pour une extension future à 5 niveaux)
- Burundi Water Supply and Sanitation Access Project: Recrutement d’un consultant (firme) en charge de l’élaboration du diagnostic, des études d’APS, du PGES, des études d’APD, du DAO pour l'optimisation du système de filtration de l'eau brute à l'Usine de traitement de l'eau du Lac Tanganyika SP2
- BDI1207611-10059 – Marché de services relatif au « Recrutement d’un bureau chargé de réaliser une étude pour la mise en place d’un système de gestion rationnelle des eaux des espaces de l’ISABU pour la production des semences agricoles »
- Burundi Water Supply and Sanitation Access Project: Acquisition de six (6) véhicules tous terrains pour les deux UGP du PAEPA, la DGR-PEPA et l'AHAMR
- AOI - Burundi - Achat des trois véhicules double cabine tout terrain - PASEREC
