Watts Nature Reserve Boardwalk
Sector: Cement • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
Replacement of the Boardwalk at Watts Nature Reserve, School Hill, Shortlanesend, Truro 1.Introduction Kenwyn Parish Council invites qualified contractors to submit tenders for the replacement of the existing boardwalk located at Watts Nature Reserve, School Hill, Shortlanesend, Truro. Removal of the existing structure does not form part of this tender. The purpose of this project is to ensure a
- Status
- Closed
- Sector
- Cement, Steel, Forest Products and Packaging, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Watts Nature Reserve Boardwalk
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Replacement of the Boardwalk at Watts Nature Reserve, School Hill, Shortlanesend, Truro 1.Introduction Kenwyn Parish Council invites qualified contractors to submit tenders for the replacement of the existing boardwalk located at Watts Nature Reserve, School Hill, Shortlanesend, Truro. Removal of the existing structure does not form part of this tender. The purpose of this project is to ensure a safe, durable, and accessible structure that meets current standards and enhances the surrounding environment. 2. Project Overview • Project Title: Boardwalk Replacement Project • Location: Watts Nature Reserve, School Hill, Shortlanesend, Truro • Scope: Construction and installation of new boardwalk and associated site works. Approximate length of the boardwalk is 250m • Contract Type: Design & build • Expected Start Date: 9 March 2026 • Expected Completion Date: 30 April 2026 3. Scope of Work The contractor will be responsible for: 3.1 Construction of New Boardwalk • Supply and installation of all materials • Construction of substructure, 1.2m wide decking, handrails (where the drop is more than 1m), and access points. Surface is to be anti-slip. • Compliance with relevant building codes, accessibility standards, and environmental guidelines 3.2 Materials • Timber: Suitably treated • Fasteners: Corrosion resistant stainless steel • Foundations: Concrete footings 3.3 Additional Requirements • Site safety and public access management • Protection of nearby vegetation and wildlife • Final inspection and certification 4. Contractor Requirements Tenderers must provide: • Evidence of similar completed projects • Health & safety policy and risk assessment • Environmental management plan • Insurance certificates • Proposed project schedule • Detailed cost breakdown 5. Evaluation Criteria Tenders will be evaluated based on: • Anticipated project completion date • Cost competitiveness • Environmental considerations • Quality of materials proposed 6. Submission Instructions • Deadline: 1 February 2026 • Submission Format: Sealed envelope • Address: C/o Shortlanesend Village Hall, School Hill, Shortlanesend, Truro TR4 9DU All tenders must remain valid for 30 days from the submission deadline. 7. Additional Information Site visits can be arranged upon request. Questions or clarifications should be submitted to Julie Larter, Clerk to Kenwyn Parish Council, clerk@kenwynparishcouncil.gov.uk Tel 07345703374. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Cement, Steel, Forest Products and Packaging, Commercial |
Article published date | 2026-03-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Cement tenders in United Kingdom
- Provision and installation of burial vaults
- Remedial Repair Works to Eastern Boundary Wall at St Mary's Closed Churchyard, Henley
- Mansion House major refurbishment - Main Contractor
- Austwick to Clapham Public Bridleway Improvement Project
- Replacement floors and associated works at 21 and 23 Lonsdale Ave, WSM (717-AHL)
- Tender for Supply and Construction of Steel Building
- PME for Live Fire Training Facility
- Installation of CVIM Generator Back Up Power
