Weiler Road Fuel Management
The scope, dates and status of this tender. A free account opens every field.
Source: California Purchasing Group
Understory fuels reduction to reduce the vertical and horizontal continuity of wildfire fuels across 3 acre area along Weiler Ranch Road via mechanical mastication and manual hand removal methods . North of Weiler Ranch Road , approximately 2 acre , brush ( including poison oak ) and trees less than 12 ” in dia
- Status
- Closed
- Sector
- Road, Power Generation (CCGT), Commercial
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Weiler Road Fuel Management
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Understory fuels reduction to reduce the vertical and horizontal continuity of wildfire fuels across 3 acre area along Weiler Ranch Road via mechanical mastication and manual hand removal methods . North of Weiler Ranch Road , approximately 2 acre , brush ( including poison oak ) and trees less than 12 ” in diameter shall be removed and chipped , or masticated in place , up to 100 ’ from the edge of road . South of Weiler , approximately 1 acre , brush and trees less than 10 ” in diameter shall be removed and chipped by hand within 25 ’ of the roadway . All debris generated by the project shall be chipped and hauled from site . Debris generated by mechanical mastication may remain if less than 3 ” in diameter and in lengths less than 4 ’. Area to be treated shall run approximately from the West property boundary near Oddstadt Boulevard to the Valley View trail head . On the south side of Weiler the project shall run from the western property boundary to the San Pedro Valley Park shop . All stumps shall be cut to near ground level , no more than 3 ” above natural grade . Eucalyptus and other invasive woody vegetation shall be treated with herbicide to reduce likelihood of resprouting . A small stand of eucalyptus across from the San Pedro Valley Shop entrance , approximately 20 trees , shall be removed completely . The majority of this stand is between 10 - 15 ” in diameter ( estimated ). A small number , may exceed 20 ” in diameter . All debris shall be hauled from site , unless otherwise directed by Ranger staff . Stumps to be treated with herbicide . Six larger diameter eucalyptus on the south side of the project area ( between Weiler Ranch Road and San Pedro Creek ) shall be removed to reduce falling limb hazards and continue restoration of the creek corridor . Trees will be tagged and marked with orange paint . All debris shall be removed from site unless otherwise directed by Ranger staff . Stumps shall be treated with herbicide . Work will require careful planning to reduce risk of conflict with primary distribution lines along Weiler Ranch Road . Contractors may need to consider power shut - off or using equipment capable of working within minimum approach distances of energized conductors . Understory fuels management performed on the south side of the road shall be done by hand to reduce amount of soil disturbance above the creek . Removal of logs and debris from larger tree removals will likely require access with a crane . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Power Generation (CCGT), Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
