Welder - Lincoln Cooper CRX
One of 9,043 tenders Taiyo tracks in Minnesota.
Source: Minnesota Purchasing Group
Project Overview Minnesota State is requesting bids for a Lincoln Cooper CRX 10iA / L Cobot . Also provide training for SCTCC instructors to ensure safe and proper operation of the machine as installed . Installed equipment must be compliant with all local code requirements . Technical / Functional Requirements Linc
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Minnesota, United States of America
- Updated
- 3 Nov 2026
- Source
- Minnesota Purchasing Group
ConstructChat
Ask ConstructChat about Welder - Lincoln Cooper CRX
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project Overview Minnesota State is requesting bids for a Lincoln Cooper CRX 10iA / L Cobot . Also provide training for SCTCC instructors to ensure safe and proper operation of the machine as installed . Installed equipment must be compliant with all local code requirements . Technical / Functional Requirements Lincoln Cooper CRX 10iA / L Cobot with tablet - based teach pendant Lincoln Power Wave ® R450 robotic welding power source System will require 480v three phase for the welder and 115v for the robot AutoDrive ® 4R100 wire feeder – Drive Rolls for . 035 and . 045 wire MAGNUM ® PRO air - cooled Torch and Wire Brake – Spare Contact tips for . 035 and . 045 Wire The Cooper App Fault reset palm station Welding Cart Holds both robot and weld equipment Heavy - duty casters and adjustable stabilizing pads Fixturing tabletop Spool Holder that is attached to the welding cart Custom lead guide – Mod - Weld Torch Roller Dress - out Kit ( 10 ) Rolls of Lincoln L - 59 Welding Wire ( 10 ) hours of on - site installation assistance and training Installation SCTCC will be responsible for all unloading and rigging at their facilityTo take place during standard business hours 8am to 5pm , Monday through Friday . To take place during standard business hours 8am to 5pm , Monday through Friday . Up to ten ( 10 ) hours for training after final acceptance . Final system acceptance is required prior to the start of training . Training to be completed in consecutive days . Site Acceptance ( SAT ) Run - Off Criteria : Seller will perform a functional run - off after installation at the customer site . This run - off will demonstrate the functionality of the robot controls and weld equipment operation . Run - off will be located at customer facility |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | Minnesota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
