Welding Lab HVAC
Sector: Water Supply and Storage • Location: MITN, United States of America
Source: MITN Purchasing Group
Branch ISD Welding Lab HVAC Upgrades Project All systems shall be installed complete and fully functional . Scope listed below is a general description and is not limited to the following . Demolition – Remove existing welding lab exhaust ductwork as indicated . Remove existing roof mounted exhaust fans . Remove
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Welding Lab HVAC
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Branch ISD Welding Lab HVAC Upgrades Project All systems shall be installed complete and fully functional . Scope listed below is a general description and is not limited to the following . Demolition – Remove existing welding lab exhaust ductwork as indicated . Remove existing roof mounted exhaust fans . Remove existing heating and ventilating unit serving the welding lab and associated ductwork . All equipment abandon by new work shall be removed . Welding Exhaust Systems – Provide new system spark guards , welding fume extractor , extractor , exhaust fan , welding exhaust hoods , welding booth vertical exhaust hoods and ductwork . Compressed Air Piping –. Extend compressed air to new welding fume extractor . HVAC piping and Heating Systems - Provide new heating hot water piping systems and pipe insulation , to fan coil unit and air handling unit . Temperature Controls Systems - Provide air flow measuring devices and programming modifications to new air handling unit serving welding lab . Provide control and monitoring to new welding lab exhaust systems . Note this scope of work shall be furnished and installed by Johnson Controls Inc . Metasys . Test and Balancing - Provide air and water balancing of all new scope of work . Electrical Systems - Provide electrical power for new welding exhaust systems , new air handling unit , new fan coil unit , relocated existing welding lab and machine shop electrical duct banks . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
