Well 9 Drilling and Construction
One of 10,000+ tenders Taiyo tracks in Washington.
Source: Washington Purchasing Group
The City of Oak Harbor ( City ) is developing a new emergency groundwater supply at its Well 9 site . The City requires construction of a new well to replace existing Well 9 on the same parcel as shown on the attached Site Map and Vicinity Map in Exhibit B . Drilling will consist of advancing 20 -
- Status
- Closed
- Sector
- Steel, Seaport
- Location
- Washington, United States of America
- Updated
- 3 Nov 2026
- Source
- Washington Purchasing Group
ConstructChat
Ask ConstructChat about Well 9 Drilling and Construction
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Oak Harbor ( City ) is developing a new emergency groundwater supply at its Well 9 site . The City requires construction of a new well to replace existing Well 9 on the same parcel as shown on the attached Site Map and Vicinity Map in Exhibit B . Drilling will consist of advancing 20 - inch - diameter steel casing to a depth of 20 feet to create a sanitary seal and a 16 inch - diameter casing to a maximum depth of 250 feet which will depend on aquifer characteristics identified during drilling . The boring will be completed with a 12 - inch - diameter wire - wrapped stainless steel well screen and a sand filter pack . The City ’ s representative , RH2 Engineering , Inc . ( RH2 ) will observe drilling and testing activities and will provide a well screen design for the Contractor . The well may be drilled using either fluid rotary methods without drilling mud , or cable tool methods . The selected method must be capable of reaching the target depth , retrieving representative samples of aquifer materials as drilling proceeds , and constructing the new well . The existing well 9 well log indicates that a sand aquifer occurs at depths ranging between 180 to 243 feet below ground surface ( bgs ). Static groundwater level within the aquifer occurs at approximately 180 feet bgs . Layers of dense glacial till , and clay overlie the sand aquifer . Well driller logs for existing Well 9 and nearby wells 8 and 11 are in Exhibit A . All well drilling and construction shall comply with WAC 173 - 160 . |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Washington Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Steel, Seaport |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States of America
- Construction Materials Testing and Inspection Services for Thousand Oaks Boulevard Pedestrian Crossing CI 5398
- Street Construction Materials
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Marin Street Sewer Replacement - BID TABULATION
- Southeast Water Pollution Control Plant HVAC and Mechanical ...
