logo

Well 9 Drilling and Construction

One of 10,000+ tenders Taiyo tracks in Washington.

Source: Washington Purchasing Group

Tender
Closed

The City of Oak Harbor ( City ) is developing a new emergency groundwater supply at its Well 9 site . The City requires construction of a new well to replace existing Well 9 on the same parcel as shown on the attached Site Map and Vicinity Map in Exhibit B . Drilling will consist of advancing 20 -

Status
Closed
Sector
Steel, Seaport
Location
Washington, United States of America
Updated
3 Nov 2026
Source
Washington Purchasing Group

ConstructChat

Ask ConstructChat about Well 9 Drilling and Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Well 9 Drilling and Construction” is a tender record in Taiyo, linked to the Steel sector. It is issued for works, goods, or services related to Washington, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The City of Oak Harbor ( City ) is developing a new emergency groundwater supply at its Well 9 site . The City requires construction of a new well to replace existing Well 9 on the same parcel as shown on the attached Site Map and Vicinity Map in Exhibit B . Drilling will consist of advancing 20 - inch - diameter steel casing to a depth of 20 feet to create a sanitary seal and a 16 inch - diameter casing to a maximum depth of 250 feet which will depend on aquifer characteristics identified during drilling . The boring will be completed with a 12 - inch - diameter wire - wrapped stainless steel well screen and a sand filter pack . The City ’ s representative , RH2 Engineering , Inc . ( RH2 ) will observe drilling and testing activities and will provide a well screen design for the Contractor . The well may be drilled using either fluid rotary methods without drilling mud , or cable tool methods . The selected method must be capable of reaching the target depth , retrieving representative samples of aquifer materials as drilling proceeds , and constructing the new well . The existing well 9 well log indicates that a sand aquifer occurs at depths ranging between 180 to 243 feet below ground surface ( bgs ). Static groundwater level within the aquifer occurs at approximately 180 feet bgs . Layers of dense glacial till , and clay overlie the sand aquifer . Well driller logs for existing Well 9 and nearby wells 8 and 11 are in Exhibit A . All well drilling and construction shall comply with WAC 173 - 160 .

Location

Country

United States of America (USA)

State

Washington

Source

Source

Washington Purchasing Group

URL

More Details

Record type

Tender

Sector

Steel, Seaport

Article published date

2026-05-14

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender