West Michigan , South , & Lovell Engineering Design
Sector: Power Transmission • Location: MITN, United States of America
Source: MITN Purchasing Group
• Task 1 – Complete Topographic Survey : Task 1 will include completing topographic survey of the project area suitable for developing accurate construction plans that meet MDOT and City requirements and specifications . At a minimum , this area shall be to the spring point of each side street and ROW limit
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Road
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about West Michigan , South , & Lovell Engineering Design
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | • Task 1 – Complete Topographic Survey : Task 1 will include completing topographic survey of the project area suitable for developing accurate construction plans that meet MDOT and City requirements and specifications . At a minimum , this area shall be to the spring point of each side street and ROW limits . Consultant shall provide traffic control and apply for a ROW permit ( no fee ) at least ten business days before starting survey work . Besides the topographic survey , the consultant will collect public and private utility data for the project area . The Consultant will coordinate its survey schedule with City staff ( minimum two weeks in advance ) to ensure all City owned utilities are marked before the survey and surveyed during survey completion . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT), Road |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- Utility Management System and Services UMSS
- FY2023 Patch Truck
- Desert Willow Perimeter Landscape and Lighting Rehabilitation Phase 2 Project
