West O ' ahu Sewer Improvements - Princess Kahanu Estates Subdivis
Closed · Hawaii · Last reported Jan 2026
Source: Hawaii Purchasing Group
WEST O ‘ AHU SEWER IMPROVEMENTS – WAI ‘ ANAE SUBDIVISION IFB - 23 - HHL - 013 BID PROPOSAL ITEM NO . DESCRIPTION ESTIMATED QUANTITY QUANTITY UNIT UNIT PRICE TOTAL 1 Mobilization and Demobilization for all construction work ( not to exceed 6 % of total Basic Bid excluding the bid price . 1 Lump Sum $ $ 2 Installation
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Residential, Power Generation (CCGT)
- Location
- Hawaii, United States of America
- Updated
- 3 Nov 2026
- Source
- Hawaii Purchasing Group
ConstructChat
Ask ConstructChat about West O ' ahu Sewer Improvements - Princess Kahanu Estates Subdivis
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | WEST O ‘ AHU SEWER IMPROVEMENTS – WAI ‘ ANAE SUBDIVISION IFB - 23 - HHL - 013 BID PROPOSAL ITEM NO . DESCRIPTION ESTIMATED QUANTITY QUANTITY UNIT UNIT PRICE TOTAL 1 Mobilization and Demobilization for all construction work ( not to exceed 6 % of total Basic Bid excluding the bid price . 1 Lump Sum $ $ 2 Installation of Temporary Erosion Control , at disturbed areas , inclusive of all types of filter devices , inspection , operation , maintenance , record keeping / reporting per ESCP and NPDES requirements , renewal of NPDES permits , and removal of temporary BMP ' s . 1 Lump Sum $ $ 3 Traffic Control Work including redesign ( if necessary ) of the traffic control , plans , obtainment of permits , advertisement , placement and removal of all traffic control devices ( including but not limited to cones , barriers , signs , message boards , temporary bus stops , etc .), temporary pavement makings and striping , detours , cleanup , restoration , and all incidentals required to complete the work , including special duty police officers . 1 Lump Sum $ $ 4 Pre - and Post - Construction Survey of site conditions for the entire project area , including utility crossings , buried sewer manholes and cleanouts ( topographic survey as required ), photo and video files and reports ; post construction topographic survey of newly installed pipe inverts at water manholes , sewer manholes , drain manholes / catch basins , and sewer cleanouts ; and as - built drawings . 1 Lump Sum $ $ |
Location
Country | United States of America (USA) |
State | Hawaii |
Source
Source | Hawaii Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Residential, Power Generation (CCGT) |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
