West Towne Path Phase 2B

The scope, dates and status of this tender. A free account opens every field.

Source: Wisconsin Purchasing Group

Tender
Closed

The West Towne Path from Zor Shrine Place to Gammon Road is proposed to be constructed in 2028 . The project is anticipated to include numerous retaining walls along USH 12 ( Beltline ). Path lighting and local Storm Sewer will be included in the design . The Plans , Specifications and Estimate ( PSE ) packa

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Tunnel, Road
Location
Wisconsin, United States of America
Updated
3 Nov 2026
Source
Wisconsin Purchasing Group

ConstructChat

Ask ConstructChat about West Towne Path Phase 2B

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “West Towne Path Phase 2B” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Wisconsin, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The West Towne Path from Zor Shrine Place to Gammon Road is proposed to be constructed in 2028 . The project is anticipated to include numerous retaining walls along USH 12 ( Beltline ). Path lighting and local Storm Sewer will be included in the design . The Plans , Specifications and Estimate ( PSE ) package is due to WisDOT on August 1 , 2027 . The City has performed preliminary engineering , 30 % plans , one public information meeting scheduled in April 2025 and expect a signed environmental document in June 2025 . The Consultant services are assumed to pick up where the City design has progressed to and complete 60 % plans and DSR through Final PSE package and Construction . Construction Engineering will be performed by WisDOT . A path was built in 2025 from High Point Road to Zor Shrine Place and will be the western tie - in for this project . The Eastern tie - in will be the existing pedestrian / bicycle underpass of Gammon Road . The project will require traffic control during construction . A Transportation Project Plat or document similar will be completed for acquiring right of way and grading easements if needed . The project is proposed to be funded by Surface Transportation Block Grant ( STBG ) funds and will be let through the Wisconsin Department of Transportation ( WisDOT ) Local Program .

Location

Country

United States of America (USA)

State

Wisconsin

Source

Source

Wisconsin Purchasing Group

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Water Supply and Storage, Tunnel, Road

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender