logo

Weston High School Locker Rm . Replace Heating Unit / Install Heating & Cooling Unit

Sector: Water Supply and Storage • Location: Connecticut, United States of America

Source: Connecticut Purchasing Group

Tender
Closed

The Weston Board of Education ( the “ Board ”) is inviting qualified proposers to submit bids for the replacement of one rooftop mounted heating and ventilating unit with packaged DX cooling and hot water rooftop unit at the Weston High School team / locker room . The selected vendor will provide RTU and HV

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Education, Commercial, Road
Location
Connecticut, United States of America
Updated
3 Nov 2026
Source
Connecticut Purchasing Group

ConstructChat

Ask ConstructChat about Weston High School Locker Rm . Replace Heating Unit / Install Heating & Cooling Unit

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Weston High School Locker Rm . Replace Heating Unit / Install Heating & Cooling Unit” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Connecticut, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Weston Board of Education ( the “ Board ”) is inviting qualified proposers to submit bids for the replacement of one rooftop mounted heating and ventilating unit with packaged DX cooling and hot water rooftop unit at the Weston High School team / locker room . The selected vendor will provide RTU and HVAC unit replacement services . The scope includes , but is not limited to : RTU / HVAC Unit Replacement - Removal and proper disposal of existing rooftop unit . - Furnish and install one packaged 15T Daikin Rebel Rooftop Unit , or comparable , with BACnet communication , electric cooling , hot water coil , power exhaust , two space sensors ( space averaging ), and unit mounted controller . Unit shall be provided with curb adapter . - Unit shall be provided with packaged controller to allow for full control of RTU heating and cooling . Note that additional connection to BMS will be required for equipment status / alarm , unit setback / scheduling , and switchover from heating to cooling . - Proper rigging , crane coordination , and rooftop safety measures . - Curb adapters or modifications , if required . - Coordination with Weston staff to minimize operational disruption . Mechanical & Electrical Integration - Connection to existing ductwork , electrical , and controls . - Mechanically disconnect existing hot water coil located above ceiling in girls team room A . Ceiling shall be removed by others to provide all necessary access for coil removal and installation of ductwork . Provide new ductwork for location where hot water coil was removed . - Replacement or modification of disconnects , whips , and controls as required . - Electrically feed new unit from panel located within boiler room located at south end of building . New feed shall penetrate roof above boiler room and route across roof approximately 225 ’ to new unit . Provide separate 120V feed for service outlet located on unit . - Coordination with building automation system .

Location

Country

United States of America (USA)

State

Connecticut

Source

Source

Connecticut Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Power Generation (CCGT), Education, Commercial, Road

Article published date

2026-05-05

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender