Westwood - Robichaud and Thorne Partial Roof Replacement
The scope, dates and status of this tender. A free account opens every field.
Source: MITN Purchasing Group
1 ) Remove existing roof and roofing components , including counter - flashings , copings , gravel stops , and insulation , down to decking . Check decking for deficiencies and replace or repair deteriorated decking at the cost / sf price as identified on the bid form . Thorne Metal Decking Sections – 11 , 12 , & 14 , Tho
- Status
- Closed
- Sector
- Wind, Metal, Cement
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Westwood - Robichaud and Thorne Partial Roof Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 ) Remove existing roof and roofing components , including counter - flashings , copings , gravel stops , and insulation , down to decking . Check decking for deficiencies and replace or repair deteriorated decking at the cost / sf price as identified on the bid form . Thorne Metal Decking Sections – 11 , 12 , & 14 , Thorne Concrete Decking Section – 13 , Robichaud Metal Decking Section – 4 . 2 ) At Thorne , Section 13 ( Concrete Decking ), the deck is to receive a primer coat of Garla - prime at 0 . 5 gallons per square and HPR Torch Base sheet installed per Garland standard details . 3 ) At Thorne Section 13 , install 1 / 8 " tapered polyisocyanurate insulation system with minimum 2 " base . All insulation over concrete deck shall be adhered with InsuLock HR at the specified rate to achieve necessary wind uplift values as specified . 4 ) At Thorne metal decking sections ( 11 , 12 , & 14 ), install 1 / 8 " tapered polyisocyanurate insulation system with minimum 2 " base at predetermined fastening pattern to achieve necessary wind uplift values as specified . 5 ) At Robichaud , install ¼ ” tapered polyisocyanurate insulation system with minimum 2 " base at predetermined fastening patter to achieve necessary wind uplift values ad designed . 6 ) Mechanically fasten ¼ ” tapered insulation crickets between drain locations to facilitate positive drainage where necessary 7 ) Install ½ ” Primed Wood Fiberboard set in InsuLock insulation adhesive per wind uplift requirements . 8 ) Sump all drains where allowed to achieve 4 ' x 4 ' pan . 9 ) At Thorne , all expansion joint is to be replaced . Raise curbs of expansion joints as necessary to achieve minimum 8 " height . 10 ) All accessories such as cant strips , drain inserts ( or new drains ), sealants , etc . are to be installed as identified in specifications and drawings . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Wind, Metal, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in United States of America
- Winter Shelter Site Request for Information
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- North Sphere Wind Fence Installation Project
- Invitation For Bid IFB Guadalupe Memorial Garden
- Request for Qualifications Weather Response for Persons Experiencing Homelessness
- Fuel Tank Inspection and Repair Services
- Quote 20Q1 Repair Services for Musical Instruments
- 525 Golden Gate Avenue Tower Access and Fall Protection
