White River National Forest- Vault Pumping Services
One of 10,000+ tenders Taiyo tracks in Colorado.
Source: SAM.gov
This is a sources sought only, not requesting any quotes at this time. Looking for viable vendors that can encompass the entire White River National Forest for vault pumping services. This requirement is to provide septic pumping service of sixty-six (64) vaults at twenty-four (24) US Forest Service managed recreation sites located in Eagle, Garfield, Pitkin, and Summit Counties, Colorado as ident
- Status
- Prospective
- Sector
- Raw Materials, Waste Processing and Treatment, Commercial, Residential
- Location
- Glenwood Springs, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about White River National Forest- Vault Pumping Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This is a sources sought only, not requesting any quotes at this time. Looking for viable vendors that can encompass the entire White River National Forest for vault pumping services. This requirement is to provide septic pumping service of sixty-six (64) vaults at twenty-four (24) US Forest Service managed recreation sites located in Eagle, Garfield, Pitkin, and Summit Counties, Colorado as identified in the attached. This requirement will be set-aside for 100% small business concerns. The applicable North American Industry Classification Standard Code is 562991-Septic Tank and Related Servces. The small business size standard is $9 Million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The 24 recreation sites contain a total of 64 1000 gallon vault toilets and 1 vault of 500 gallons. All vaults need to be pumped when they reach 80% capacity, with 90% of the vault content removed. Generally, the vaults will require at least one (1) pumping per year, but some vaults will be pumped multiple times a year. All vault waste shall be disposed of at a commercial treatment facility off National Forest Lands. Provide the quantity of volume pumped for at each site and note any discrepancies or abnormalities (cracks, chips, vandalism, or broken hatch) at the vault sites. Please respond to curtis.r.landreth@usda.gov with a capability statement showing capability of covering the entire White River National Forest. See attachments for Maps |
Original sector | Administrative and Support and Waste Management and Remediation Services |
Location
Country | United States of America (USA) |
State | Colorado |
City | Glenwood Springs |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Raw Materials, Waste Processing and Treatment, Commercial, Residential |
Article published date | 2026-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Raw Materials tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Hay Cutting and Removal for Jordan Farm and Coleman Farm
- Antiscalant Chemical
- As-Needed Sewer Inspection (FY23) [BID TABULATION]
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- Sunol Valley Water Treatment Plant Ozonation
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
