Wilbur Square Park Irrigation Renovation
One of 9,207 tenders Taiyo tracks in Nevada.
Source: Nevada Purchasing Group
This work shall include furnishing all labor , material , and equipment to complete the project WILBUR SQUARE PARK IRRIGATION RENOVATION as described in the specifications and shown in the plans . Work includes replacing the existing irrigation system at Wilbur Square with a new , fully automated system to serv
- Status
- Closed
- Sector
- Water Supply and Storage, Advanced Electronics, Road
- Location
- Nevada, United States of America
- Updated
- 3 Nov 2026
- Source
- Nevada Purchasing Group
ConstructChat
Ask ConstructChat about Wilbur Square Park Irrigation Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This work shall include furnishing all labor , material , and equipment to complete the project WILBUR SQUARE PARK IRRIGATION RENOVATION as described in the specifications and shown in the plans . Work includes replacing the existing irrigation system at Wilbur Square with a new , fully automated system to serve the park ’ s turfgrass areas . This work shall also include but is not limited to construction of a new point - of - connection to the existing raw water distribution mainline , installation of mainline and lateral piping , booster pumping equipment , pedestalmounted irrigation controller , rain sensor , flow valve assemblies , gate valves , valve boxes , quick coupling valves , etc . The system will utilize a conventional lowvoltage wire setup with supplementary two - wire cable for future conversion . Contractor shall verify existing site conditions and provide all required fittings and connections as shown in the contract documents . The work also includes all turf repair needed due to the work . The Contractor will be allowed to close the whole park for their work operations for the duration of the contract . The Contractor shall fence the park , for their operations if the Contractor decides to close the whole park . The Contractor will be required to maintain the fencing during the work week and over the weekends . The Contractor shall be responsible for insuring any open work areas are safe from the public during non - working hours and over the weekends . NOTE : There are three planned special events in and near this park in March 2026 . Two in Bicentennial Park , March 14 and March 21 , 2026 ( across Colorado Street from Wilbur Square ) and one in Wilbur Square on March 28 , 2026 . The Contractor shall be required to work with the City and the special event coordinator to allow for the event in Wilbur Square to proceed safely . This will include opening available portions of the park for the special event ( if the Contractor decides to close the park for the work ). |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Nevada Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Advanced Electronics, Road |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
