logo

William E Dunn Water Reclamation Facility North Booster Pump Station Electrical Improvements

Sector: Commercial • Location: Clearwater, Florida, United States of America

Source: Open Gov Tenders

Tender
Closed

The project includes improvements to the electrical system at the William E. Dunn Water Reclamation Facility and Electrical Improvements at the North Booster Pump Station.At the W.E. Dunn Facility, the project includes the removal of the existing transformers at the east Motor Control Center (MCC), west MCC, and Maintenance building; removal and replacement of the existing east and west MCCs; remo

Tender Information FAQ

Tender Information

3 Q
The tender “William E Dunn Water Reclamation Facility North Booster Pump Station Electrical Improvements” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Clearwater, Florida, United States of America.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes improvements to the electrical system at the William E. Dunn Water Reclamation Facility and Electrical Improvements at the North Booster Pump Station.At the W.E. Dunn Facility, the project includes the removal of the existing transformers at the east Motor Control Center (MCC), west MCC, and Maintenance building; removal and replacement of the existing east and west MCCs; removal of the existing east and west generator sets; installation of two new transformers; installation of two new generators, new electrical building and installation of new conduit and wiring as required.At the North Booster Pump Station, the project includes the removal and replacement of three Variable Frequency Drives (VFDs), improvements to the heating, ventilation, and air conditioning (HVAC) system, lightning protection system, fire detection system and upgrades to the programmable logic controllers (PLCs). 

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data