Wind Turbines
Planning · United Kingdom
Source: Find a Tender Service (UK)
Yorkshire Water (YW) and Kelda are seeking to engage the market to discuss their planned deployment of new on-shore wind turbines. Work done to date indicates deployments of 1-3 turbines at each location, with 7 sites under consideration initially plus 2 re-powering sites. As YW and Kelda look to expand this programme, they anticipate a small scale wind development programme in addition. The deplo
- Status
- Prospective
- Sector
- Water Supply and Storage, Wind, Commercial, Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Wind Turbines
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Yorkshire Water (YW) and Kelda are seeking to engage the market to discuss their planned deployment of new on-shore wind turbines. Work done to date indicates deployments of 1-3 turbines at each location, with 7 sites under consideration initially plus 2 re-powering sites. As YW and Kelda look to expand this programme, they anticipate a small scale wind development programme in addition. The deployments would be on YW operational land and would directly power the adjacent operational site, offsetting grid purchased power. Early turbine identification, based on site constraints and available wind yields, suggests Kelda are looking to initially procure in the 500 kW - 3.45 MW range. This will result in a variance of turbine sizes from hub heights between 40 - 80 meters, and tip heights up to the region of, but not limited to, 117 metres. Later phases of wind development will be in the sub 250 kW range. The purpose of this notice is to open discussion with turbine manufacturers / suppliers to understand; - Equipment / turbines availability; - Indicative lead times for supply; - Indicative pricing, both capex and opex; - Indicative commercial terms; and - After sales maintenance provision. - Transport management - Installation These are non-conclusive and are likely to change as development progresses. YW and Kelda anticipate the award of the procurement in 3 bandings: 1. 1MW A procurement partner may look to cover all of these bandings or just 1. YW and Kelda are open to both new and refurbished turbines via direct purchases from OEMs, broker facilitated procurement and framework agreements. |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Wind, Commercial, Power Generation (CCGT) |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
