logo

Windows , Doors , ADA Shower

Bids closed Mar 2026 · Illinois · Last reported Mar 2026

Source: Illinois Purchasing Group

Tender
Closed

The City of Rock Island is requesting bids from contractors for a rehabilitation project at a house located at 816 21st Street . This City of Rock Island property will be undergoing rehabilitation using Illinois Housing Development Authority funds to ameliorate deteriorating and deteriorated conditions . All wo

Status
Closed
Sector
Road, Water Supply and Storage, Advanced Electronics, Metal, Steel, Commercial, Cement
Location
Illinois, United States of America
Updated
3 Nov 2026
Source
Illinois Purchasing Group

ConstructChat

Ask ConstructChat about Windows , Doors , ADA Shower

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Windows , Doors , ADA Shower” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Illinois, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The City of Rock Island is requesting bids from contractors for a rehabilitation project at a house located at 816 21st Street . This City of Rock Island property will be undergoing rehabilitation using Illinois Housing Development Authority funds to ameliorate deteriorating and deteriorated conditions . All work shall be subject to IDHA and Environmental Protection Agency ( EPA ) regulations . Scope of Work The bidder shall submit a project plan using the design standards below that is in compliance with all applicable IDHA , EPA , and State of Illinois regulations as well as all local building and zoning codes . The plan must include a clear project timeline and budget with line item costs . The contractor shall act as the general contractor for the project using subcontractors as required . Subcontractors that will be required should be clearly identified in the project plan . Alternative specifications shall be considered only if they are clearly justified , cost effective , and meet all project objectives . The contractor shall have 30 days to complete the work from the date of contract signing . Change work orders over the course of the project are strongly discouraged . Exterior This project has multiple objectives with different trades required . Replace the light at the front door with a new fixture with a motion activated sensor . Adjust the sensitivity on the sensor once its been installed . Remove the existing front door and storm door . Install new pre - hung steel or fiberglass door . The slab must be double bore for lock set and dead bolt . Adjustable threshold which will be adjusted to door sweep sealing out air . Install a new aluminum screen door . Must have self - storing screen . Must have double closure or single with a chain at the top . Door must be adjusted to close when the exterior is shut . Remove and install new pre - hung exterior and storm door on the rear entry . Same scope as the front door . All locket sets and deadbolts shall open with one key . Install a weather cap on the clay chimney . This should keep the water and animals out of the flue . Remove 7 vinyl windows from the existing openings . The bathroom window will be removed and framed and sheathed . Install a water barrier over the sheathing . Install white break metal over the water barrier with overlapping running horizontal keeping water infiltrations . This shall be caulked to the stone veneering using white quad . The new windows will need to meet the energy code requirements 2021 IECC . These windows will be double hung with locking tabs ( child ). Half screen for each unit will be accepted . Interior Remove the existing tub in the bathroom . Rough in plumbing for a new walk in 5 ’ shower . In the process of the shower rough in the vanity and the water closet will need moved to give the 30 ” space required for the stool . The vanity will be changed to a wall mounted sink that will slide over to the inside corner giving the stool the extra inches it needs to comply . The stool will need to be a new high rise centered in the left - over space between shower and wall sink . The window framing will to need be insulated and vaper barrier installed behind the new shower . The shower will need two stainless steel ADA grab bars installed so back will need to be installed . The shower fixture should ne delta single handle with a head that will also convert to a hand - held wand . The shower shall have a masonry slush bedding under the shower base eliminating flexing in the floor pan . Shower will need to be leveled and squared to the best ability given the conditions of the existing framing and floor . The existing built in shelving will be removed to accommodate the new shower unit . The Wayne ’ s coating and trim will need to be blended back to fixtures and walls . Primed and Painted to match the existing color . The walls will have water board ( green ) rated for wet areas in place of patch work . Patches shall be blended in with tape , mud , sanded , primed , and painted .

Location

Country

United States of America (USA)

State

Illinois

Source

Source

Illinois Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Advanced Electronics, Metal, Steel, Commercial, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender