Windows , Siding , and Painting
The scope, dates and status of this tender. A free account opens every field.
Source: Arkansas Purchasing Group
The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall Construct all construction safety barriers to keep bystanders out of work areas and at a safe distance fo
- Status
- Closed
- Sector
- Metal, Steel, Commercial, Hotel
- Location
- Arkansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Arkansas Purchasing Group
ConstructChat
Ask ConstructChat about Windows , Siding , and Painting
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall Construct all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project . 2 . Prospective contractor shall furnish all tools , materials and equipment , and labor necessary to complete project . 3 . All Work shall be completed within ( 60 days ) from the bid award date . Exclusions material or weather delays . 4 . Prospective contractor shall Prevent unnecessary damage to any part of building . 5 . Prospective contractor shall be responsible for all post - project clean - up . 6 . Prospective contractor shall remove all debris ( including nails and metals , all disposable materials offsite ) at the end of each workday . 7 . Prospective contractor shall work during normal park business hours . 8 . Prospective contractor shall schedule all work with park officials . 9 . Prospective contractor shall provide one ( 1 ) year warranty that applies to all work performed . 10 . Prospective contractor shall furnish Workmen ’ s Comp ., General Liability Insurances . 11 . Photographs may be requested by Greg Hart during the installation . 12 . Prospective contractor shall be responsible for all materials deliveries and protection of during construction . 13 . Prospective contractor shall be responsible for protection of building from elements during all periods of construction . 14 . Prospective contractor shall remove all old trim and siding and replace any bad or rotten wood with equivalent thickness . 15 . Prospective contractor shall remove front and side storm doors and replace with equivalent size with new 2000 Series 32 in . x 80 in . White Universal Full View Retractable Aluminum Storm Door or equivalent . 16 . Prospective contractor shall remove old gable vents Approx . 2 ea . And install new polyurethane weather resistant vents Octagonal Gable Vent in Sandstone ( Overall 22 in . x 22 in . x 1 . 88 in .) or equivalent . 17 . Prospective contractor shall remove existing soffit ( Approx . 000 ’ sq . ft .) and replace any bad or rotten wood and install new LP Smartside cedar texture soffit material . 18 . Prospective contractor shall apply house wrap before the new siding is installed . 19 . Prospective contractor shall be responsible for the removal and protection of all gutters , downspouts and the reinstallation of gutters , downspouts . Note any part damaged in removal will have to be replaced . 20 . Prospective contractor shall remove all old fascia and install new 5 / 4 " x same width LP Smartside Cedar texture fascial boards ( Approx . 176 ’ lin . Ft .) 21 . Prospective contractor should note that a Subfascia maybe required for new fascia stability and straightness . 22 . Prospective contractor shall install all the new LP Smartside Cedar texture 5 / 4 " trim with minimum ( 2 ½ " finish Galvanized fasteners ) And siding installed with minimum length 1 ½ " galvanized HD roofing nail . 23 . Prospective contractor shall Install new LP Smartside lock panel cedar texture 7 / 16 " x 8 " ( Approx . 1 ’ 190 sq . ft .) lap siding horizontally using 5 / 4 " x 4 " LP Smartside cedar texture trim around all doors , windows and on inside and outside corners and against soffit eves and rake . 24 . Prospective contractor shall trim any electrical breaker boxes and HVAC disconnects with the LP Smartside Cedar texture 5 / 4 " x4 " if siding cannot be cut to look good . 25 . Prospective contractor shall remove any exterior electrical plugs or fixtures and shall be mounted on a flat piece of the cedar texture of adequate size panel and shall be trimmed with 5 / 4 " x4 " trim so the fixtures will set flat with siding butting up to all of the trim and then reinstall electric fixtures . 26 . Prospective contractor shall make sure that all of the horizontal siding butts up to the 5 / 4 " x4 " trim and has no more than a maximum of a ¼ " gap . 27 . All butt joints on siding shall have a 6 " in . wide and 1 " in . overlap Joint flashing or zip system stretch tape or equivalent . |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | Arkansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Steel, Commercial, Hotel |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
