logo

Windows , Siding , and Painting

The scope, dates and status of this tender. A free account opens every field.

Source: Arkansas Purchasing Group

Tender
Closed

The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall Construct all construction safety barriers to keep bystanders out of work areas and at a safe distance fo

Status
Closed
Sector
Metal, Steel, Commercial, Hotel
Location
Arkansas, United States of America
Updated
3 Nov 2026
Source
Arkansas Purchasing Group

ConstructChat

Ask ConstructChat about Windows , Siding , and Painting

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Windows , Siding , and Painting” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Arkansas, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall Construct all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project . 2 . Prospective contractor shall furnish all tools , materials and equipment , and labor necessary to complete project . 3 . All Work shall be completed within ( 60 days ) from the bid award date . Exclusions material or weather delays . 4 . Prospective contractor shall Prevent unnecessary damage to any part of building . 5 . Prospective contractor shall be responsible for all post - project clean - up . 6 . Prospective contractor shall remove all debris ( including nails and metals , all disposable materials offsite ) at the end of each workday . 7 . Prospective contractor shall work during normal park business hours . 8 . Prospective contractor shall schedule all work with park officials . 9 . Prospective contractor shall provide one ( 1 ) year warranty that applies to all work performed . 10 . Prospective contractor shall furnish Workmen ’ s Comp ., General Liability Insurances . 11 . Photographs may be requested by Greg Hart during the installation . 12 . Prospective contractor shall be responsible for all materials deliveries and protection of during construction . 13 . Prospective contractor shall be responsible for protection of building from elements during all periods of construction . 14 . Prospective contractor shall remove all old trim and siding and replace any bad or rotten wood with equivalent thickness . 15 . Prospective contractor shall remove front and side storm doors and replace with equivalent size with new 2000 Series 32 in . x 80 in . White Universal Full View Retractable Aluminum Storm Door or equivalent . 16 . Prospective contractor shall remove old gable vents Approx . 2 ea . And install new polyurethane weather resistant vents Octagonal Gable Vent in Sandstone ( Overall 22 in . x 22 in . x 1 . 88 in .) or equivalent . 17 . Prospective contractor shall remove existing soffit ( Approx . 000 ’ sq . ft .) and replace any bad or rotten wood and install new LP Smartside cedar texture soffit material . 18 . Prospective contractor shall apply house wrap before the new siding is installed . 19 . Prospective contractor shall be responsible for the removal and protection of all gutters , downspouts and the reinstallation of gutters , downspouts . Note any part damaged in removal will have to be replaced . 20 . Prospective contractor shall remove all old fascia and install new 5 / 4 " x same width LP Smartside Cedar texture fascial boards ( Approx . 176 ’ lin . Ft .) 21 . Prospective contractor should note that a Subfascia maybe required for new fascia stability and straightness . 22 . Prospective contractor shall install all the new LP Smartside Cedar texture 5 / 4 " trim with minimum ( 2 ½ " finish Galvanized fasteners ) And siding installed with minimum length 1 ½ " galvanized HD roofing nail . 23 . Prospective contractor shall Install new LP Smartside lock panel cedar texture 7 / 16 " x 8 " ( Approx . 1 ’ 190 sq . ft .) lap siding horizontally using 5 / 4 " x 4 " LP Smartside cedar texture trim around all doors , windows and on inside and outside corners and against soffit eves and rake . 24 . Prospective contractor shall trim any electrical breaker boxes and HVAC disconnects with the LP Smartside Cedar texture 5 / 4 " x4 " if siding cannot be cut to look good . 25 . Prospective contractor shall remove any exterior electrical plugs or fixtures and shall be mounted on a flat piece of the cedar texture of adequate size panel and shall be trimmed with 5 / 4 " x4 " trim so the fixtures will set flat with siding butting up to all of the trim and then reinstall electric fixtures . 26 . Prospective contractor shall make sure that all of the horizontal siding butts up to the 5 / 4 " x4 " trim and has no more than a maximum of a ¼ " gap . 27 . All butt joints on siding shall have a 6 " in . wide and 1 " in . overlap Joint flashing or zip system stretch tape or equivalent .

Location

Country

United States of America (USA)

State

Arkansas

Source

Source

Arkansas Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Steel, Commercial, Hotel

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender