Wmf Rob Brook Bridge Replacement

Sector: Raw Materials • Location: Campton, New Hampshire, United States of America

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

Q&A Memorandum #2 (Final): Uploaded 9 July 2026 ------------------------------------------------------------------------------- Solicitation Amendment 0002, Issued 30 June 2026, implements the following changes: 1) The Period of Performance is revised from "NTP + 150 days" to "NTP + 440 days" and the Period of Performance end date is extended from 30 December 2026 to 10 November 2027 2) The Statem

Status
Prospective
Sector
Raw Materials, Residential, Commercial, Bridge, Road
Location
Campton, New Hampshire, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Wmf Rob Brook Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Wmf Rob Brook Bridge Replacement” is a tender record in Taiyo, linked to the Raw Materials sector. It is issued for works, goods, or services related to Campton, New Hampshire, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Q&A Memorandum #2 (Final): Uploaded 9 July 2026 ------------------------------------------------------------------------------- Solicitation Amendment 0002, Issued 30 June 2026, implements the following changes: 1) The Period of Performance is revised from "NTP + 150 days" to "NTP + 440 days" and the Period of Performance end date is extended from 30 December 2026 to 10 November 2027 2) The Statement of Work (SOW) is updated via attachment C05_1-12445526Q0070_0002-Att1-SOW_Rev2. This update revises the Period of Performance and incorporates reference and access to the applicable USACE General Permit #23. 3) The QUESTION deadline is extended to 1300 EDT on 06 July 2026 4) The QUOTE due date is extended to 1700 EDT on 15 July 2026 All other solicitation documents, terms, and conditions remain unchanged. ------------------------------------------------------------------------------- Q&A Memorandum: Uploaded 23 June 2026 ------------------------------------------------------------------------------- Solicitation Amendment 0001, Issued 18 June 2026, implements the following changes: 1) Statement of Work (SOW) is updated via attachment C05_1-12445526Q0070_0001-Att1-SOW_Rev1. The following changes have been made: "Tree cutting shall only be performed within the following calendar window: November 1 and April 14th" is revised and replaced with: "Tree cutting shall only be performed within the following calendar window: Trees shall be cut between August 16th to April 14th." All other solicitation documents, terms, and conditions remain unchanged.. ------------------------------------------------------------------------------- This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445526Q0070 is issued as a Request for Quotation (RFQ) for WMF Rob Brook Bridge Replacement. PROJECT SUMMARY: The USFS is pursuing a Purchase Order for the reconstruction of Rob Brook Road Bridge on the White Mountain National Forest. Work includes but is not limited to demolition of the existing 28' bridge structure, proper disposal of all materials, and construction of the new 44' bridge. Services shall be performed by the awardee in accordance with the specifications, terms, and conditions of this solicitation, including those found in the solicitation attachments. SET-ASIDE: This solicitation is set aside 100% for Small Business entities under NAICS 237310 - Highway, Street, and Bridge Construction (Size Standard: $45M). PROJECT LOCATION: Saco Ranger District, White Mountain National Forest. See solicitation and its attachments for additional location details. PROJECT MAGNITUDE: between $1,000,000 and $5,000,000 SOLICITATION POINT OF CONTACT: Matthew (Matt) Killian, Contracting Officer matthew.killian@usda.gov PLEASE REVIEW ALL SOLICITATION MATERIALS IN-FULL, INCLUDING ALL INSTRUCTIONS TO OFFERORS, PRIOR TO SUBMITTING A QUOTATION. LATE QUOTATIONS AND/OR QUOTATIONS THAT DO NOT COMPLY WITH SAID INSTRUCTIONS MAY BE DETERMINED NON-REPONSIVE AND ELIMINATED FROM AWARD CONSIDERATION.

Original sector

Construction

Location

Country

United States of America (USA)

State

New Hampshire

City

Campton

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Raw Materials, Residential, Commercial, Bridge, Road

Article published date

2026-07-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender