WNC Duston Reservoir Path Replacement
Sector: Water Supply and Storage • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
West Northamptonshire Council owns and manages many areas of amenity land to the benefit of the local and wider community. The Council manages a large body of open water at Duston Reservoir. As well as being a valuable amenity, the reservoir also serves to provide part of the Northampton flood protection measures. The site includes a circular path, which is partly of bituminous and partly of grad
- Status
- Bidding
- Sector
- Water Supply and Storage
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about WNC Duston Reservoir Path Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | West Northamptonshire Council owns and manages many areas of amenity land to the benefit of the local and wider community. The Council manages a large body of open water at Duston Reservoir. As well as being a valuable amenity, the reservoir also serves to provide part of the Northampton flood protection measures. The site includes a circular path, which is partly of bituminous and partly of graded stone macadam construction. The circular path is constructed upon the crest of a raised embankment, which was itself constructed in 1997. Continued consolidation of the embankment has led to movement, cracking and failures of sections of the bituminous path. The stone macadam path has eroded and requires surface restoration. This project will restore the surface integrity of the paths through a mixture of stone surface siding out and resurfacing, bituminous surface reinforcement and re-surfacing, bituminous surface crack sealing and bituminous surface reconstruction. The scope of works is described in detail within the contract drawings Working Methodology: Bituminous path reconstruction will be by traditional methods with as much work as is practicable to be undertaken by mechanical plant. This is in order to minimise the extent of manual handling required. Bituminous path restoration work will be through the removal of surface course and the reinforcement of the surface/binder course interface with a proprietary net. Stone macadam path restoration will be by siding out overgrown edges to expose existing path edges and laying a new surface course of self-binding gravel. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
