WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools
Sector: Commercial • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
Wiltshire Council intend to appoint a main Contractor via a two-stage procurement opportunity to deliver an important project on a full design and build basis across three primary schools in Wiltshire. Stage 1 of the procurement process is to seek expressions of interest from prospective Contractors with a view to shortlisting a maximum of four Contractors to be invited to submit a tender for the
- Status
- Closed
- Sector
- Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Wiltshire Council intend to appoint a main Contractor via a two-stage procurement opportunity to deliver an important project on a full design and build basis across three primary schools in Wiltshire. Stage 1 of the procurement process is to seek expressions of interest from prospective Contractors with a view to shortlisting a maximum of four Contractors to be invited to submit a tender for the project. Stage 2 of the procurement process will be the Invitation to Tender (ITT) itself. The Requirement: The following schools have been identified by the Council as having temporary classrooms which are in a dilapidate state and are in need of replacement by way of either new build developments (Hullavington and Minety), and internal alterations and refurbishment of existing school buildings (Frogwell Primary School): 1. Frogwell Primary School, Chippenham, 2. Hullavington Primary School, Hullavington, Chippenham, 3. Minety Primary School, Malmesbury The purpose of this procurement opportunity is to appoint a contractor on a full design and build basis, in the first instance operating under a Pre-Construction Services Agreement and working closely with the Schools and the Council through RIBA Work Stages 1 to 4. This Stage 1 appointment will include the following outputs: 1. Operating under a single PCSA to deliver the RIBA Work Stages 1 to 4 inclusive for each of the three schools including. 2. The appointment of a Design Team to work with the School and the Employers Representative to fully design each of the three projects to the end of RIBA Stage 4 (technical/construction design) and to present the design for approval at the end of each RIBA work stage including cost plans for Employer approval, 3. To develop a detailed programme for RIBA Stages 1 to 7 for acceptance by the Employer for each of the three projects, 4. To obtain Building Regulations approval and Planning Permission for each of the three projects, 5. To work collaboratively with the Employers Representative to produce a Fixed Price Lump Sum to deliver the construction works for each of the three projects for approval by the Employer. On acceptance by the Council of the fixed price lump sum costs to deliver the construction works for each of the three projects, individual construction contracts will be entered into (JCT Intermediate form of contract with Contractor Design) for each school site. These will be the Stage 2 works, and each school project will be delivered as a standalone project through RIBA Work Stages 5, 6 and 7 (Construction, Handover and in Use). The indicative forecast cost estimate for the Stage 1 pre-construction works is £450k + VAT and the indicative forecast cost estimate of the Stage 2 post contract works is: Frogwell Primary School £2.0m + VAT = £2.4m Hullavington Primary School £2.0m + VAT = £2.4m Minety Primary School £0.75m + VAT = £0.9m --------------------------- Total Estimated Construction Cost incl VAT £5.7m Key Programme Dates as follows: RIBA Stages 1 to 4 End August 25 to End March 26 Package Pricing Stage End March 26 to End June 26 Final Design & Fixed Price Lump Sum Approvals End June 26 to Mid July 26 RIBA Stage 5 Construction Start August 26 Handover To be agreed for each of the school sites during the pre-construction stage of the project |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Commercial |
Article published date | 2026-03-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United Kingdom
- Usługa kompleksowej organizacji udziału przedsiębiorstw z województwa łódzkiego w charakterze wystawców na targach branży spożywczej IFE 2026
- Tender for Play Area Works within the Borough of Ards and North Down
- SUMIT Project Hardware and Connectivity Services
- Laboratory Consumables and Chemicals
- NCH - Mental Health Unit Furniture Tender
- ID 6246207 - SEUPB - Information Services - Data Protection Officer Advisory Services
- Aquisição de Serviços para ações de promoção e divulgação das DOP Porto e Douro no mercado do Reino Unido
- SUMIT Project - Provision of Digital Products