Wood Dust extraction unit and Biomass Burner
Contract notice · Ireland · Last reported Jan 2026
Source: TED Europa
There is 2 descrptions for dust extraction and Biomass burner . To be priced separatley but supplier must ensure they can supply both items Dust extraction : Fabric Filter Unit with compress air Jet cleaning System, comes with access doors and Explosion Panels as standard. Filter Unit Filtration Capacity – comes with a minimum 35Kw fan delivering 25 to 30m/s velocity. • Allow for 19 machine connec
- Status
- Closed
- Sector
- Biomass, Power Generation (CCGT), Steel, Manufacturing (Industrial), Road, Geothermal, Metal, Commercial
- Location
- carrick on suir, Ireland
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Wood Dust extraction unit and Biomass Burner
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | There is 2 descrptions for dust extraction and Biomass burner . To be priced separatley but supplier must ensure they can supply both items Dust extraction : Fabric Filter Unit with compress air Jet cleaning System, comes with access doors and Explosion Panels as standard. Filter Unit Filtration Capacity – comes with a minimum 35Kw fan delivering 25 to 30m/s velocity. • Allow for 19 machine connections • All ductwork to EN12237:2004 Standard • Clip assembly Galvanised Steel ductwork • 2 separate extraction lines into building • Air speeds between 25m/s - 30m/s • 8m3 storage chamber • Pulse jet cleaning with compressed air • Negative pressure system • Filtered Air return to reduce thermal • Auger discharge to boiler / skip • Invertor driven system • Machine equipped with automatic shut offs • Various hoover points throughout ductwork • Hoover cleaning kits • Max height of main extraction unit = 7 meters • Transport, installation and commissioning Biomass Burner: To be priced separatley Allow for a minimum 300kw Biomass burner to burn MDF AND MFC wood waste. • Multi Fuel Boiler • 3 phase power as standard |
Original sector | Industrial machinery, Industrial machinery, Industrial machinery, Industrial machinery, Industrial machinery |
Location
Country | Ireland |
City | carrick on suir |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Biomass, Power Generation (CCGT), Steel, Manufacturing (Industrial), Road, Geothermal, Metal, Commercial |
Article published date | 2026-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Biomass tenders in Ireland
- Pilot-scale Decanter Centrifuge and a Disc Stack Centrifuge
- Tender for Mechanical and Electrical consultancy services for Kerry ETB installation of Biomass boiler with backup LPG
- Schools Energy Pathfinder 2025 - Biomass Programme - Heating Upgrade and Building Enabling Works Package - Bundle 4 (CMETB)
- Call for Tender for the Supply of a Seaweed Direct Seeding Machine and Supporting Services
- Schools Energy Pathfinder 2025 - Biomass Programme - Heating Upgrade and Building Enabling Works Package - Bundle 3 (Cork ETB)
- Single Supplier Framework Contract for the provision of Fuel Charge Card Services (3 Lots)
- Schools Energy Pathfinder 2025 - Biomass Programme - Heating Upgrade and Building Enabling Works Package - Bundle 6 (DDLETB
- Schools Energy Pathfinder 2025 - Biomass Programme - Heating Upgrade and Building Enabling Works Package - Bundle 4 (CMETB)
