logo

Wood Dust extraction unit and Biomass Burner

Closed · Ireland

Source: Office of Government Procurement, Ireland

Tender
Closed

There is 2 descrptions for dust extraction and Biomass burner . To be priced separatley but supplier must ensure they can supply both items Dust extraction : Fabric Filter Unit with compress air Jet cleaning System, comes with access doors and Explosion Panels as standard. Filter Unit Filtration Capacity – comes with a minimum 35Kw fan delivering 25 to 30m/s velocity. • Allow for 19 machine connec

Status
Closed
Sector
Biomass, Government, Power Generation (CCGT), Geothermal, Residential, Commercial, Steel, Metal
Location
Ireland
Updated
3 Nov 2026
Source
Office of Government Procurement, Ireland

ConstructChat

Ask ConstructChat about Wood Dust extraction unit and Biomass Burner

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Wood Dust extraction unit and Biomass Burner” is a tender record in Taiyo, linked to the Biomass sector. It is issued for works, goods, or services related to Ireland.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

There is 2 descrptions for dust extraction and Biomass burner . To be priced separatley but supplier must ensure they can supply both items Dust extraction : Fabric Filter Unit with compress air Jet cleaning System, comes with access doors and Explosion Panels as standard. Filter Unit Filtration Capacity – comes with a minimum 35Kw fan delivering 25 to 30m/s velocity. • Allow for 19 machine connections • All ductwork to EN12237:2004 Standard • Clip assembly Galvanised Steel ductwork • 2 separate extraction lines into building • Air speeds between 25m/s - 30m/s • 8m3 storage chamber • Pulse jet cleaning with compressed air • Negative pressure system • Filtered Air return to reduce thermal • Auger discharge to boiler / skip • Invertor driven system • Machine equipped with automatic shut offs • Various hoover points throughout ductwork • Hoover cleaning kits • Max height of main extraction unit = 7 meters • Transport, installation and commissioning Biomass Burner: To be priced separatley Allow for a minimum 300kw Biomass burner to burn MDF AND MFC wood waste. • Multi Fuel Boiler • 3 phase power as standard

Location

Country

Ireland

Source

Source

Office of Government Procurement, Ireland

URL

More Details

Record type

Tender

Sector

Biomass, Government, Power Generation (CCGT), Geothermal, Residential, Commercial, Steel, Metal

Article published date

2025-10-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender