WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Bids closed Jun 2026 · United Kingdom · Last reported Jun 2026
Source: Contracts Finder
Expression of Interest Tunnel Vent, Fans and Fan Drives MEP SubcontractorTunnel Vent, Fans and Fan Drives (Survey and RIBA 4) ScopeThe objective of this scope is to replace components that form part of the ventilation system at Central Terminal Area (CTA) North and South, Terminal 4 North and South and Sipson Farm, that are at their end of life. The components of concern are Fan Drives and Low Vol
- Status
- Prospective
- Sector
- Power Generation (CCGT), Rail, Raw Materials, Tunnel, Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Contracts Finder
ConstructChat
Ask ConstructChat about WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | opportunity |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Expression of Interest Tunnel Vent, Fans and Fan Drives MEP SubcontractorTunnel Vent, Fans and Fan Drives (Survey and RIBA 4) ScopeThe objective of this scope is to replace components that form part of the ventilation system at Central Terminal Area (CTA) North and South, Terminal 4 North and South and Sipson Farm, that are at their end of life. The components of concern are Fan Drives and Low Voltage Air Circuit Breakers.It is proposed that all components for the 8 No. existing Variable Speed Drives (VSD) which are close to their designed lifetime are to be replaced, together with the panel.It is proposed that all components for the 5 No. existing Direct On-Line (DOL) starters which are close to their designed lifetime are to be replaced, together with the panel are replaced with VSD's.The VSDs are to be connected to the Tunnel Control System (TCS).The incoming air circuit breakers (ACB's) and the low voltage protection devices (MCCB/MCB's) within the existing switch gear will be replaced with new devices. Where the impact is significant, this may lead to replacing the entire LV switchgear and the DOL panels for the associated equipment.New lighting will be provided by energy-efficient LED luminaires, as the existing lighting system is in poor condition.As part of small power provision, 240V socket outlet assemblies shall be provided near damper units. The existing junction boxes and cable termination boxes need to be replaced with new equipment.Item QuestionQ1 What capability do you have of understanding the requirements for replacing Electrical infrastructure etc., Specifically considering the constraints of an operational rail network?Q2 What capability do you have of carrying out a survey of the 5 ventilation buildings non-operational hours to provide all the information required to complete the RIBA 4 design?Note: - RIBA 5 onwards including construction is excluded. |
Location
Country | United Kingdom (UK) |
Source
Source | Contracts Finder |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Rail, Raw Materials, Tunnel, Road |
Article published date | 2026-06-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
