WPCP Modifications
Sector: Forest Products and Packaging • Location: Georgia, United States
¿Sealed bids for construction of the WPCP Modifications (2021 CWSRF) will be received until May 15, 2026 at 10:00 AM local time. Bids must be submitted electronically through QuestCDN.com No paper submissions will be accepted. Base Cost of all Bids shall be published to the QuestCDN website no later than 30 minutes after the closing time. Any bid received after said time and date will not be consi
- Status
- Closed
- Sector
- Forest Products and Packaging, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about WPCP Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | ¿Sealed bids for construction of the WPCP Modifications (2021 CWSRF) will be received until May 15, 2026 at 10:00 AM local time. Bids must be submitted electronically through QuestCDN.com No paper submissions will be accepted. Base Cost of all Bids shall be published to the QuestCDN website no later than 30 minutes after the closing time. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law. The work shall include, but not be limited to, aerated grit system replacement, primary clarifier abandonment, clarifier bypass line and flume channel installation, pump station bypass piping and pad installation for portable pump use, skid-mounted WAS pump and piping installation at RAS/WAS pump station, pump, wetwell top and pipe replacement at facility pump station, air compressor system replacement with associated pipe and HVAC modifications, miscellaneous plant-wide equipment component furnishing and replacement, and associated electrical and SCADA improvements. Work also includes demolition, mobilization/demobilization, bonds, insurance, delivery of materials, taxes, and all other appurtenances necessary for completion of the Work. Time allotted for completion of work is 360 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.¿ |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Forest Products and Packaging, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Forest Products and Packaging tenders in United States
- System Wide Copy Paper IFB2027-01
- Construction of the Man O'War Trail Phase VII
- School Nutrition Program Paper Goods & Supplies IFB 2027-03
- Standby Contract for Disaster Logistic Support System
- 2027-06 Grapple Dump Trailer 2.0
- Quarry Raw Water Supply Project (Contract "E")
- Paper and Chemical Products
- IWQ 130841 Replacement of a Pavillion Pergola
