logo

WPCP Modifications

Sector: Forest Products and Packaging • Location: Georgia, United States

Tender
Under Evaluation

¿Sealed bids for construction of the WPCP Modifications (2021 CWSRF) will be received until May 15, 2026 at 10:00 AM local time. Bids must be submitted electronically through QuestCDN.com No paper submissions will be accepted. Base Cost of all Bids shall be published to the QuestCDN website no later than 30 minutes after the closing time. Any bid received after said time and date will not be consi

Status
Closed
Sector
Forest Products and Packaging, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Procurement Registry

ConstructChat

Ask ConstructChat about WPCP Modifications

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “WPCP Modifications” is a tender record in Taiyo, linked to the Forest Products and Packaging sector. It is issued for works, goods, or services related to Georgia, United States.

Participants

Not available for this record.

Status

Original status

under evaluation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

¿Sealed bids for construction of the WPCP Modifications (2021 CWSRF) will be received until May 15, 2026 at 10:00 AM local time. Bids must be submitted electronically through QuestCDN.com No paper submissions will be accepted. Base Cost of all Bids shall be published to the QuestCDN website no later than 30 minutes after the closing time. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law. The work shall include, but not be limited to, aerated grit system replacement, primary clarifier abandonment, clarifier bypass line and flume channel installation, pump station bypass piping and pad installation for portable pump use, skid-mounted WAS pump and piping installation at RAS/WAS pump station, pump, wetwell top and pipe replacement at facility pump station, air compressor system replacement with associated pipe and HVAC modifications, miscellaneous plant-wide equipment component furnishing and replacement, and associated electrical and SCADA improvements. Work also includes demolition, mobilization/demobilization, bonds, insurance, delivery of materials, taxes, and all other appurtenances necessary for completion of the Work. Time allotted for completion of work is 360 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.¿

Original sector

Construction / Public Works

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Procurement Registry

URL

More Details

Record type

Tender

Sector

Forest Products and Packaging, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2026-10-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender