logo

WRAP Framework FRA081 Call Off: IoACC Infrastructure cost update

Complete · United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Complete

In 2023 WRAP commissioned work with Isle of Anglesey County Council (IoACC) to review existing infrastructure and developed a set of concept infrastructure solutions to help inform decision making. The study explored the potential of both the Council’s current Waste Transfer Stations (WTSs) challenging their ability to be adapted to support future service changes. The existing facilities both r

Status
Closed
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about WRAP Framework FRA081 Call Off: IoACC Infrastructure cost update

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “WRAP Framework FRA081 Call Off: IoACC Infrastructure cost update” is a tender record in Taiyo. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

In 2023 WRAP commissioned work with Isle of Anglesey County Council (IoACC) to review existing infrastructure and developed a set of concept infrastructure solutions to help inform decision making. The study explored the potential of both the Council’s current Waste Transfer Stations (WTSs) challenging their ability to be adapted to support future service changes. The existing facilities both require modification to meet the demand of future services. Increases in material storage capacity, additional separation bays and compliance upgrades formed the basis of the fundamental changes required under all solutions explored. Using information scaled from the concept design CAD drawings and drainage designs, a cost estimation was calculated for each of the solutions. These were based on SPONS and RIBA guidance and based on 2023 prices. The details of these costs need to be updated to account for price changes and inflation since 2023, on the assumption of construction taking place in 2028. The output should be a short report addendum report containing the updated content, in line with Section 7.0 Indicative solution costing of the original report.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Article published date

2026-06-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender