WWTP SBR 1 & Digester Rehabilitation
One of 10,000+ tenders Taiyo tracks in Pennsylvania.
Source: Pennsylvania Department of Transportation (PennDOT)
THIS PROJECT DOES NOT REQUIRE YOU TO STOP AT THE VISITORS CENTER TO GAIN ACCESS. THE WASTE WATER TREATMENT PLANT IS LOCATED OUTSIDE THE GATES. This PROJECT IS A STANDARD LOW BID PROJECT and includes: GENERAL CONSTRUCTION The work under this Contract shall generally consist of but is not limited to providing all labor, material, devices, tools and equipment required for the replacement of existing
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Commercial
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania Department of Transportation (PennDOT)
ConstructChat
Ask ConstructChat about WWTP SBR 1 & Digester Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | THIS PROJECT DOES NOT REQUIRE YOU TO STOP AT THE VISITORS CENTER TO GAIN ACCESS. THE WASTE WATER TREATMENT PLANT IS LOCATED OUTSIDE THE GATES. This PROJECT IS A STANDARD LOW BID PROJECT and includes: GENERAL CONSTRUCTION The work under this Contract shall generally consist of but is not limited to providing all labor, material, devices, tools and equipment required for the replacement of existing treatment equipment and application of protective coating system to concrete surfaces in SBR #1 and Digester #1 at the Fort Indiantown Gap Wastewater Treatment Plant. All Work shall be in accordance with the specifications and drawings and subject to the terms and conditions of all other Contract Documents. ESTIMATED RANGE: General Construction - $2,000,001.00 - $3,000,000.00 Liquidated Damages: General Construction - $750.00 per day MANDATORY PRE-BID CONFERENCE: The Pre-Bid Conference will take place on Thursday June 4, 2026, at 10:00AM at the Waste Water Treatment Plant - Building 4-174 (map attached in bid documents), Fort Indiantown Gap, Annville, Lebanon County, PA. ALL POTENTIAL BIDDERS MUST BE PRESENT TO SUBMIT A BID SUBMISSION. Questions are due back by COB 4:30PM EST on June 18, 2026. Bids are due by Tuesday June 30, 2026, by 2:00PM TBD: The Department of General Services Public Works and the Business Inclusion and Supplier Development (BISD) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction – SDB = 19% VBE = 3% BIDS FOR THIS PROJECT WILL ONLY BE ACCEPTED ELECTRONICALLY THROUGH WWW.PASUPPLIERPORTAL.STATE.PA.US. Any questions with the PA Supplier Portal must go through the Help Desk at 877-435-7363. |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania Department of Transportation (PennDOT) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Cement, Commercial |
Article published date | 2026-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States
- Network Rail Commercial Property Maintenance Framework PSQ
- 66325- Buford Southside WPCP Secondary Clarifier
- Hard Labor Creek Water Transmission Main Phase I
- Road Resurfacing
- Water Reclamation & Conveyance Programmable Logic Controller Uprade - Event No. 12100
- 761 - Thermoelectric Energy Forecasting
- FY26 CDBG Engineering Services
- FY26 CDBG Grant Administration
