Wy Mt Np Multi Pms(1), Pavement Preservation Wyoming And Montana
Presolicitation · Wyoming
Source: SAM.gov
PROJECT: WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and Montana LOCATION: The project work is located in 5 National Park sites: Devils Tower National Monument (DETO), Fossil Butte National Monument (FOBU), Grand Teton National Park (GRTE) and John D. Rockefeller JR Memorial Parkway (JODR) in Wyoming; and Grant-Kohrs National Historic Site (GRKO) in Montana. The approximate latitude and l
- Status
- Prospective
- Sector
- Car parking, Commercial, Automotive, Residential, Bridge, Road
- Location
- Yellowstone National Park, Wyoming, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Wy Mt Np Multi Pms(1), Pavement Preservation Wyoming And Montana
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | PROJECT: WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and Montana LOCATION: The project work is located in 5 National Park sites: Devils Tower National Monument (DETO), Fossil Butte National Monument (FOBU), Grand Teton National Park (GRTE) and John D. Rockefeller JR Memorial Parkway (JODR) in Wyoming; and Grant-Kohrs National Historic Site (GRKO) in Montana. The approximate latitude and longitude coordinates for the project are: • DETO: 44°35'25.54"N, 104°43'11.57"W • FOBU: 41°50'11.57"N, 110°46'18.18"W • GRTE: 43°39'17.20"N, 110°43'3.69"W • JODR: 44° 6'23.93"N, 110°39'55.82"W • GRKO: 46°24'19.96"N, 112°44'9.50"W WORK: This project consists of pavement preservation and parking lot rehabilitation. See “Project Description” and preliminary plans posted under Attachments for additional details. LENGTH: Base- 57.45 miles and parking areas Option X- 15 miles Option Y- 0.62 miles and parking areas Option Z- 0.61 miles TENTATIVE COMPLETION DATE: Fall 2027 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 10,000,000 and $20,000,000. INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Western Region Pavement Preservation MATOC. Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/west-region-pavement-pres This project is anticipated to be solicited Fall 2026. There will be a Base schedule plus 3 Options. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Yellowstone National Park |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Car parking, Commercial, Automotive, Residential, Bridge, Road |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Car parking tenders in United States of America
- Security Hardware Services
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- PreQualification of Bidders for Chaboya Improvements
- 2022 Concrete Repairs Jackson Manor Subdivision
- Pierce County Parks General Site Construction Services
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Citywide Tree and Stump Removal 2022
- Commercial Appliance Diagnostic and Repair Services
