Y -- Glen Canyon Powerplant and Lake Powell Switchyard
One of 9,955 tenders Taiyo tracks in Utah.
Source: Utah Purchasing Group
Department of the InteriorBureau of Reclamation – Upper Colorado RegionGlen Canyon Powerplant and Lake Powell SwitchyardNOTICE TYPE : Sources Sought ( Market Research ) NAICS : 237130 – Power and Communication Line and Related Structures ConstructionPSC : Y1MD Construction of Electrical Installations and Power Plants1 . NOTICE
- Status
- Closed
- Sector
- Power Generation (CCGT), Warehouse, Commercial, Cement, Tunnel, Residential
- Location
- Utah, United States of America
- Updated
- 3 Nov 2026
- Source
- Utah Purchasing Group
ConstructChat
Ask ConstructChat about Y -- Glen Canyon Powerplant and Lake Powell Switchyard
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Department of the InteriorBureau of Reclamation – Upper Colorado RegionGlen Canyon Powerplant and Lake Powell SwitchyardNOTICE TYPE : Sources Sought ( Market Research ) NAICS : 237130 – Power and Communication Line and Related Structures ConstructionPSC : Y1MD Construction of Electrical Installations and Power Plants1 . NOTICE DESCRIPTIONThis Sources Sought announcement is issued solely for market research and planning purposes in accordance with FAR Part 10 . This is NOT a solicitation , request for proposal , bid , or quote . No contract will be awarded from this notice . No reimbursement will be provided for costs associated with responding . Information received will be used to enhance acquisition planning for a future competitive requirement under FAR Parts 15 and 36 . 2 . PROJECT LOCATIONGlen Canyon Powerplant and Lake Powell SwitchyardGlen Canyon DamCoconino County , Arizona ( approx . 2 miles northwest of Page , AZ ) 3 . PROJECT OVERVIEWThe Bureau of Reclamation anticipates a construction requirement to furnish and install three ( 3 ) outdoor , three - phase station service transformers and perform associated electrical , protection , and structural work . 4 . PRINCIPAL COMPONENTS OF WORKA . Transformer Removal and ReplacementRemoval and disposal of two ( 2 ) existing station service transformers . Furnishing , installing , and commissioning three ( 3 ) new transformers : Two ( 2 ) transformers :• 3phase outdoor stepdown • 3 . 75 / 4 . 687 MVA ( KxAN / KxAF ), 55 ° C rise • 60 Hz • High side : 13 . 8 kV , 150 kV BIL • Low side : 4 . 16 kV , 75 kV BIL • 6 . 5 % impedance on 3 . 75 MVA • Tap changer : ± 2 . 5 %, 5 %• Insulating fluid : Natural esterOne ( 1 ) transformer :• 3phase outdoor stepdown • 3 . 75 / 4 . 687 MVA ( KxAN / KxAF ), 55 ° C rise • 60 Hz • High side : 25 kV , 150 kV BIL • Low side : 4 . 16 kV , 75 kV BIL • 6 . 5 % impedance on 3 . 75 MVA • Tap changer : ± 2 . 5 %, 5 %• Insulating fluid : Natural esterB . Additional Electrical & Structural Modifications • Install new neutral grounding resistors .• Remove / replace nonsegregated bus on lowside of two transformers .• Modify highside isolatedphase bus .• Furnish and install one ( 1 ) interrupter switch .• Remove two ( 2 ) existing transformer protection relays ; install three ( 3 ) new relays .• Install six ( 6 ) current transformers .• Remove existing concrete containment ; install three ( 3 ) new containment systems .• Remove / install 5 kV cable through powerplant .• Remove / install approx . 2 , 000 LF of 25 kV armored cable via tunnel and underground conduit .• Install three ( 3 ) singlepole fused disconnect switches .• Remove and replace three ( 3 ) surge arresters . 5 . ESTIMATED MAGNITUDE OF CONSTRUCTIONBetween $ 10 , 000 , 000 and $ 25 , 000 , 0006 . ANTICIPATED PERIOD OF PERFORMANCE • Period of Performance : TBD • Anticipated Contract Award : 2nd Quarter FY 20277 . SUBMISSION REQUIREMENTSInterested and capable firms are requested to submit the following : Company Information • Name , physical address , UEI , points of contact , phone , and email . Business Size & SBA Program Status under NAICS 237130 and 335311 • Indicate Small Business , HUBZone , 8 ( a ), SDVOSB , WOSB , SDB , or Large Business .• SBA certification must be verifiable in SAM . gov . Capabilities Statement • Demonstrate relevant experience and capability to perform all required work . Transformer Manufacturer Information • Manufacturer name and country of origin .• Documentation supporting compliance with FAR 52 . 2255 ( Trade Agreements ) and / or 52 . 22511 ( Buy American – Construction Materials ). Estimated Transformer Lead Time • Assume NTP = January 25 , 2027 for market research purposes . Market Conditions & Economic Price Adjustment Input • Brief statement on anticipated supply chain volatility and whether an EPA clause is advisable . Transformer Pricing Indices Used • Identify indices commonly applied for transformers with these characteristics . Bonding Capacity • Provide aggregate and single project bonding limits . 8 . RESPONSE DELIVERYEmail responses only to : Lisa LaughbonContracting OfficerEmail : lisa_laughbon @ ios . doi . govResponse Deadline : COB 5 / 1 / 2026 |
Location
Country | United States of America (USA) |
State | Utah |
Source
Source | Utah Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Warehouse, Commercial, Cement, Tunnel, Residential |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
