Y -- Glen Canyon Powerplant and Lake Powell Switchyard

One of 9,955 tenders Taiyo tracks in Utah.

Source: Utah Purchasing Group

Tender
Closed

Department of the InteriorBureau of Reclamation – Upper Colorado RegionGlen Canyon Powerplant and Lake Powell SwitchyardNOTICE TYPE : Sources Sought ( Market Research ) NAICS : 237130 – Power and Communication Line and Related Structures ConstructionPSC : Y1MD Construction of Electrical Installations and Power Plants1 . NOTICE

Status
Closed
Sector
Power Generation (CCGT), Warehouse, Commercial, Cement, Tunnel, Residential
Location
Utah, United States of America
Updated
3 Nov 2026
Source
Utah Purchasing Group

ConstructChat

Ask ConstructChat about Y -- Glen Canyon Powerplant and Lake Powell Switchyard

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Y -- Glen Canyon Powerplant and Lake Powell Switchyard” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to Utah, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Department of the InteriorBureau of Reclamation – Upper Colorado RegionGlen Canyon Powerplant and Lake Powell SwitchyardNOTICE TYPE : Sources Sought ( Market Research ) NAICS : 237130 – Power and Communication Line and Related Structures ConstructionPSC : Y1MD Construction of Electrical Installations and Power Plants1 . NOTICE DESCRIPTIONThis Sources Sought announcement is issued solely for market research and planning purposes in accordance with FAR Part 10 . This is NOT a solicitation , request for proposal , bid , or quote . No contract will be awarded from this notice . No reimbursement will be provided for costs associated with responding . Information received will be used to enhance acquisition planning for a future competitive requirement under FAR Parts 15 and 36 . 2 . PROJECT LOCATIONGlen Canyon Powerplant and Lake Powell SwitchyardGlen Canyon DamCoconino County , Arizona ( approx . 2 miles northwest of Page , AZ ) 3 . PROJECT OVERVIEWThe Bureau of Reclamation anticipates a construction requirement to furnish and install three ( 3 ) outdoor , three - phase station service transformers and perform associated electrical , protection , and structural work . 4 . PRINCIPAL COMPONENTS OF WORKA . Transformer Removal and ReplacementRemoval and disposal of two ( 2 ) existing station service transformers . Furnishing , installing , and commissioning three ( 3 ) new transformers : Two ( 2 ) transformers :• 3phase outdoor stepdown • 3 . 75 / 4 . 687 MVA ( KxAN / KxAF ), 55 ° C rise • 60 Hz • High side : 13 . 8 kV , 150 kV BIL • Low side : 4 . 16 kV , 75 kV BIL • 6 . 5 % impedance on 3 . 75 MVA • Tap changer : ± 2 . 5 %, 5 %• Insulating fluid : Natural esterOne ( 1 ) transformer :• 3phase outdoor stepdown • 3 . 75 / 4 . 687 MVA ( KxAN / KxAF ), 55 ° C rise • 60 Hz • High side : 25 kV , 150 kV BIL • Low side : 4 . 16 kV , 75 kV BIL • 6 . 5 % impedance on 3 . 75 MVA • Tap changer : ± 2 . 5 %, 5 %• Insulating fluid : Natural esterB . Additional Electrical & Structural Modifications • Install new neutral grounding resistors .• Remove / replace nonsegregated bus on lowside of two transformers .• Modify highside isolatedphase bus .• Furnish and install one ( 1 ) interrupter switch .• Remove two ( 2 ) existing transformer protection relays ; install three ( 3 ) new relays .• Install six ( 6 ) current transformers .• Remove existing concrete containment ; install three ( 3 ) new containment systems .• Remove / install 5 kV cable through powerplant .• Remove / install approx . 2 , 000 LF of 25 kV armored cable via tunnel and underground conduit .• Install three ( 3 ) singlepole fused disconnect switches .• Remove and replace three ( 3 ) surge arresters . 5 . ESTIMATED MAGNITUDE OF CONSTRUCTIONBetween $ 10 , 000 , 000 and $ 25 , 000 , 0006 . ANTICIPATED PERIOD OF PERFORMANCE • Period of Performance : TBD • Anticipated Contract Award : 2nd Quarter FY 20277 . SUBMISSION REQUIREMENTSInterested and capable firms are requested to submit the following : Company Information • Name , physical address , UEI , points of contact , phone , and email . Business Size & SBA Program Status under NAICS 237130 and 335311 • Indicate Small Business , HUBZone , 8 ( a ), SDVOSB , WOSB , SDB , or Large Business .• SBA certification must be verifiable in SAM . gov . Capabilities Statement • Demonstrate relevant experience and capability to perform all required work . Transformer Manufacturer Information • Manufacturer name and country of origin .• Documentation supporting compliance with FAR 52 . 2255 ( Trade Agreements ) and / or 52 . 22511 ( Buy American – Construction Materials ). Estimated Transformer Lead Time • Assume NTP = January 25 , 2027 for market research purposes . Market Conditions & Economic Price Adjustment Input • Brief statement on anticipated supply chain volatility and whether an EPA clause is advisable . Transformer Pricing Indices Used • Identify indices commonly applied for transformers with these characteristics . Bonding Capacity • Provide aggregate and single project bonding limits . 8 . RESPONSE DELIVERYEmail responses only to : Lisa LaughbonContracting OfficerEmail : lisa_laughbon @ ios . doi . govResponse Deadline : COB 5 / 1 / 2026

Location

Country

United States of America (USA)

State

Utah

Source

Source

Utah Purchasing Group

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT), Warehouse, Commercial, Cement, Tunnel, Residential

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender