Y--Esr 2026 Fence Perm Repair Temp Const For The Blm Vale District Office, Oregon
Presolicitation · United States of America
Source: SAM.gov
ESR 2026 Fence Perm Repair Temp Const for the BLM Vale District Office, Oregon THIS IS A PRESOLICITATION SYNOPSIS. The solicitation is anticipated to be issued on or about March 20, 2026. All responsible sources may submit a proposal which shall be considered by the agency. This procurement is a SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET ASIDE (SDVOSB). Contractor must be a SDVOSB to be con
- Status
- Closed
- Sector
- Raw Materials, Commercial, Government, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Y--Esr 2026 Fence Perm Repair Temp Const For The Blm Vale District Office, Oregon
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | ESR 2026 Fence Perm Repair Temp Const for the BLM Vale District Office, Oregon THIS IS A PRESOLICITATION SYNOPSIS. The solicitation is anticipated to be issued on or about March 20, 2026. All responsible sources may submit a proposal which shall be considered by the agency. This procurement is a SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET ASIDE (SDVOSB). Contractor must be a SDVOSB to be considered responsible. The Department of the Interior (DOI), Oregon State Office intends to issue a Request for Proposal for a firm fixed price construction contract for ESR 2026 Fence Permanent Repair and Temporary Construction for BLM Vale District Office, Oregon. The purpose of the project is to repair permanent barbed wire fences to maintain current grazing rotations on unburned areas and install temporary fences to prevent livestock from accessing roadways and protect burned areas for rest. With ESR objectives met at the Willowcreek fire area, which is now recovered for livestock use, temporary fences will be removed to allow full grazing within the fire area. Work includes modifying or repairing 34.58 miles of permanent fence across two fires to address varying wildfire damage, constructing 10.55 miles of 3-strand temporary fence on two fires, and removing 6.8 miles of temporary fence—including t-posts, easy panels, and clips—on one fire. The contractor must follow specifications for permanent fence reconstruction and all new temporary fences, and deposit removed materials neatly at each end of the temporary fence for easy pickup. The project is on land administered by the BLM Vale District Office within Malheur County, Oregon. IAW FAR 36.204, the magnitude of this construction project is between $500,000 and $1,000,000. The performance period is 242 days after issuance of Notice to Proceed (NTP). The NAICS code is 238990 and the small business size standard is $19 million. Requirement is subject to construction wage determination OR20260074, effective 01/02/2026. The most recent version will be incorporated at time of award. One or more of the items under this acquisition is subject to World Trade Organization Government Procurement Agreement and Free Trade Agreements. The basis of award will utilize the best value continuum -- lowest price technically acceptable (LPTA) source selection process in accordance with FAR subpart 15.101-2 to result in an award to the responsible offeror pursuant to FAR subpart 9.1. The technical/non-price evaluation factor is Relevant Experience. The solicitation is anticipated to be issued on or about March 20, 2026. All responsible sources may submit a proposal which shall be considered by the agency. The government point of contact for this requirement is Susanne Clark, Contract Specialist at susanneclark@blm.gov. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Raw Materials, Commercial, Government, Residential |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Raw Materials tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Hay Cutting and Removal for Jordan Farm and Coleman Farm
- Antiscalant Chemical
- As-Needed Sewer Inspection (FY23) [BID TABULATION]
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- Sunol Valley Water Treatment Plant Ozonation
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
