Y1Da--528A6-24-612 Connect Pivs To Fire Alarm System
Sector: Water Supply and Storage • Location: United States of America
Source: SAM.gov
Project No. 528A6-24-612 Connect PIV s to Fire Alarm System Construction Services Statement of Work Page 2 of 3 Bath VA Medical Center 76 Veterans Avenue Bath, NY 14810 The general scope of this project is for installation, testing, and commissioning services to add post indicator valve (PIV) system supervision and protection and update the fire zones and add voice alarms in building 78. Existing
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Car parking, Residential, Commercial, Rail, Cement, Hospital, Automotive
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Y1Da--528A6-24-612 Connect Pivs To Fire Alarm System
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project No. 528A6-24-612 Connect PIV s to Fire Alarm System Construction Services Statement of Work Page 2 of 3 Bath VA Medical Center 76 Veterans Avenue Bath, NY 14810 The general scope of this project is for installation, testing, and commissioning services to add post indicator valve (PIV) system supervision and protection and update the fire zones and add voice alarms in building 78. Existing Conditions Post indicator valves (PIV s) previously installed with new station water system currently require manual inspection/supervision and system supervision will be added. These 22 valves are building adjacent and will be linked via radio to control relays in each building s fire alarm system. Most of these buildings are aging brick structures on grounds with many legacy underground systems around them. This makes wire/conduit trenches and internal wiring routing challenging. Changing conditions over time necessitate protecting some valves from equipment and vehicle impacts. Building 78, the Community Living Center (CLC) is the onsite nursing home at the VA Medical Center (VAMC) located in Bath, New York. The current fire alarm system, 1 zone for building, does not support the current fire practice of 11 zones, 9 of which are living spaces, one for attic, one for crawlspace. This structure has been more recently remodeled, so has relatively easier structural access however is also a working patient nursing facility so work needs to be well planned and coordinated with nursing staff. Current station fire system uses Johnson Controls/Honeywell Verifire programming and components. Construction will include, but is not limited to: Post Indicator Valve (PIV) bollard protection. Removal, including underground portions, of existing bollards to be replaced. Preparation of new bollard locations including survey for locations and conflicting underground utilities. Installation of bollard protection. Return of surrounding areas to project specified and/or previous conditions. Some of these locations involve asphalt and concrete surfaces. Support of post project documentation. Installation and integration of post indicator valves (PIV) to fire control panel systems Supply, installation and configuration of Potter radio switch and supporting communication equipment. Connection to signaling line circuits (SLC) of Johnson Controls (JCI)/Honeywell fire alarm systems, to include wall penetrations, fire conduit, and panel installation. This will include penetration and sealing of masonry walls. Configuration and programming of existing station wide Johnson Controls Verifire based systems for new equipment. Support of post project documentation. Installation and integration of zone voice alarms into building 78 the community living center residence. Reconfiguration of single fire zone into 11, with 9 living areas Supply, install, wire, and connect new fire control panels. Supply, install, wire, and connect new annunciators. Configure and program fire alarm system for new zoning and equipment in all panels and monitoring locations. Ensure conditions around new equipment are restored similar to existing. Support of post project documentation. Safety Measures: Review and incorporate risk assessment and interim life safety plans and measures into safety and construction planning. Pre Construction Risk Analysis (PCRA) by VA Interim Life Safety Measures (ILSM) by VA Generate and follow a safety plan and incorporate risk and life safety assessments. The Contractor shall supply: All the materials, tools, labor, and supervision to complete this project as required on the contract drawings and in the specifications. JCI/Honeywell Verifire software is required JCI/Honeywell hardware is required Potter Signalink hardware and software is required. Contractor will adhere strictly to the plans and specifications unless directed otherwise by the CO in writing. Contractor shall have 180 days from the Notice to Proceed to complete all work. Communications and Standards All contract direction, changes, financials, and contract performance are the responsibility of the VAMC Contracting Officer (CO). Contracting Officers Technical Representative (COR) is responsible for day-to-day operations in project and the primary point of contact (POC) for project. Communications to/from VAMC, Technical communications, submittals, RFI s, change orders On site visits for construction and sub-contractors Construction coordination Site work coordination Project is required to use the Autodesk Construction Cloud Build Platform (ACC) Bath VAMC will provide licensing, permissions, and online training for this cloud-based tool at no cost to contractors. Contractor required to actively use Build on ACC for project documentation and coordination. ACC is used for submittals, requests for information, project communications and documentation. No contract financial information on ACC No personal identification information on ACC. Project must, at a minimum, be in accordance with All federal, state, and local building and safety codes MUST be followed. All work is to be completed as shown on the contract documents drawings and specifications unless otherwise directed by the facility/CO in writing. Industry Construction Standards National Fire Protection Association (NFPA), Underwriters Laboratory, International Building Code IBC 2003, National Electric Code (NEC), VA Information Security Handbook 6500.6, etc. The C&A Information Technology requirements do not apply, and a Security Accreditation Package is not required. VA supplies Access and coordination with Bath VAMC station utilities and site Licensing, permissions, and online training for Autodesk Construction Cloud Build (ACC). Location on station, north of railroad tracks, for staging area, trailers, parking |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Road, Car parking, Residential, Commercial, Rail, Cement, Hospital, Automotive |
Article published date | 2025-11-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
