Y1Da--573-21-106 Ehrm Infrastructure Upgrades And Data Center Construction - Gainesville Vamc
Sector: Telecommunications • Location: Gainesville, Florida, United States of America
Source: SAM.gov
INTRODUCTION The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single firm-fixed-price contract for the design-bid-build EHRM Infrastructure Upgrades and Data Center Construction project at the Gainesville VA Medical Center located at 1601 Southwest Archer Road, Gainesvi
- Status
- Prospective
- Sector
- Telecommunications, Data Center, Commercial, Residential, Hospital, Road
- Location
- Gainesville, Florida, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Y1Da--573-21-106 Ehrm Infrastructure Upgrades And Data Center Construction - Gainesville Vamc
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | INTRODUCTION The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single firm-fixed-price contract for the design-bid-build EHRM Infrastructure Upgrades and Data Center Construction project at the Gainesville VA Medical Center located at 1601 Southwest Archer Road, Gainesville, FL 32608. PROJECT DESCRIPTION The scope of this project is to replace all data infrastructure across the Gainesville VAMC and to build a new data center to support that upgraded system. The data center building will be one story, and the footprint will be approximately 3,931 SF at the location of temporary trailer 11, which will be demolished as part of this project. The primary space within the building is the 1,177 SF Data Center Room. Supporting spaces include Unpacking/Packing/Staging, Entrance Room, and Storage. Mechanical, Electrical, and HVAC spaces. Additionally, a new generator will be housed in a separate Generator Room. Also, this project will be removing all existing equipment and cabling affiliated with the telecom rooms in all campus buildings. There are 59 telecom rooms that may require architectural work. Some rooms are existing TRs being reused, but most are new rooms being redesigned for the telecom equipment. In rare cases telecom enclosures are recommended and/or exceptions will be required. The entire campus will be occupied while work occurs. Contractor will have to coordinate room closures and shutdowns with the COR. Most rooms on campus will be affected. Some off-hour work is anticipated for more critical spaces. ADMINISTRATIVE The solicitation will be issued as an Invitation for Bids (IFB) conducted in accordance with FAR part 14 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offers received from other than SDVOSB concerns will not be considered. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $45.0 million. The solicitation will be issued in mid to late July 2026, with an estimated late September 2026 award. The period of performance is approximately 921 calendar days from the issuance of the notice to proceed. In accordance with VAAR 836.204, the magnitude of construction is between $20,000,000 and $50,000,000 (although the middle of this range is more relevant). This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to Shawn.Tavernia@va.gov. Telephone calls will not be accepted. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Florida |
City | Gainesville |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Telecommunications, Data Center, Commercial, Residential, Hospital, Road |
Article published date | 2026-06-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Telecommunications tenders in United States of America
- Demolition 601 N Stella Ave
- Electric Trailer Mounted Underground Cable Puller
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
- Airport Terminal HVAC Improvements Phase II Vestibule Upgrades ReBid
- Widening of US 101 SB to SR 87 SB Connector Ramp US 101 SB Onramp from Story Rd
- Telephone System Consulting Services
- External Audit RFP
- Tuolumne County Broadband Environmental Assessment
