Y1Da--656-26-201 Replace Carpet Fy26 Nrm 36C263-26-Ap-2448
Solicitation · United States of America
Source: SAM.gov
The Contractor shall furnish all labor, materials, tools, and equipment necessary to remove existing flooring and install new resilient flooring and base in occupied healthcare facilities with minimal disruption, improving durability, infection control, safety, and maintainability. Work shall comply with FAR, VAAR, VA, ICRA standards, and SCVAHCS requirements. Contractor shall field-verify all qua
- Status
- Closed
- Sector
- Commercial, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Y1Da--656-26-201 Replace Carpet Fy26 Nrm 36C263-26-Ap-2448
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor, materials, tools, and equipment necessary to remove existing flooring and install new resilient flooring and base in occupied healthcare facilities with minimal disruption, improving durability, infection control, safety, and maintainability. Work shall comply with FAR, VAAR, VA, ICRA standards, and SCVAHCS requirements. Contractor shall field-verify all quantities and conditions prior to installation; any discrepancies must be reported to the COR immediately. No substitutions for specified products without CO approval. Work shall be performed in full accordance with the technical specifications including, but not limited to: Sections 00 01 15, 01 33 23, 01 35 26, 01 45 00, 01 57 19, 01 74 19, 02 41 00, 02 82 13.19, 07 84 00, 09 05 16, 09 65 19, 09 68 00 (demo only), and 09 91 00 (touch-up painting). The Contractor shall execute all work in accordance with the VA provided phasing drawings and written direction, including the sequencing for Buildings 2, 1, 28, and 29. No deviations from the approved phasing shall occur without written approval from the COR and CO. Each building shall be fully completed before mobilizing to the next, unless otherwise directed in writing. POP: 565 days after NTP |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Commercial, Residential |
Article published date | 2026-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
