Y1Da--Nrm-Const 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear
Solicitation · United States of America
Source: SAM.gov
- Updated VA Response States: Please be advised that no pre-demolition hazardous materials survey has been performed for asbestos, etc. Accordingly, each bidder shall include a reasonable allowance based on construction perimeter or square foot in their bid for all necessary hazardous materials survey, sampling, testing, and abatement services required to complete the work in compliance with app
- Status
- Prospective
- Sector
- Government, Commercial, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Y1Da--Nrm-Const 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 61. Updated VA Response States: Please be advised that no pre-demolition hazardous materials survey has been performed for asbestos, etc. Accordingly, each bidder shall include a reasonable allowance based on construction perimeter or square foot in their bid for all necessary hazardous materials survey, sampling, testing, and abatement services required to complete the work in compliance with applicable codes and regulations. This allowance shall cover, at a minimum, the costs for engaging qualified environmental consultants conducting field investigations and sampling, laboratory analysis, and performing any required abatement, removal, handling, and proper disposal of identified hazardous/regulated materials encountered within the demolition and construction areas. Concentric Questions: The above response is not acceptable. Not knowing the quantity or any scope of the abatement work, how can the contractor come up with an allowance or price? Updated VA Response: To ensure fairness for all parties, the abatement allowance will be included as an open line item for the awarded contractor. If the agency is unsure about the abatement scope of work, we request that the agency provide a fixed allowance amount for all abatement work in the bid so that all bidding contractors use the same information/allowance amount. Updated VA Response: To ensure fairness for all parties, the abatement allowance will be included as an open line item for the awarded contractor. Providing a fixed allowance amount for all the listed abatement work in the bid will ensure a fair, reasonable, and competitive offer to the government. Updated VA Response: To ensure fairness for all parties, the abatement allowance will be included as an open line item for the awarded contractor. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Government, Commercial, Residential |
Article published date | 2026-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Government tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Fuel Tank Inspection and Repair Services
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- Dual Trash and Recycling Receptacles
- Annual Inspection Testing of Aerial Devices and Digger Derricks
- 23B48LS Transit Bus Engines
- Heavy Duty Trucks and Equipment Parts and Accessories
- Automotive and Light Truck Parts and Accessories
