Yearly Wind Turbine Maintenance For Center Wind Turbine.
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
This solicitation is for Pine Ridge Job Corps Wind Turbine Maintenance at USDA FOREST SERVICE PINE RIDGE JCC, HWY 385-15710, CHADRON NE 69337. The contract is subject to Service Contract Act WD 2015-5355. Submission of questions are due 1700 PM Eastern Time on 15 September 2026. An Amendment answering all pertinent questions will be issued by 1700 PM Eastern Time on 16 September 2026. Offers are d
- Status
- Prospective
- Sector
- Raw Materials, Rail, Power Generation (CCGT), Commercial, Power Transmission, Wind, Residential, Government
- Location
- Chadron, Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Yearly Wind Turbine Maintenance For Center Wind Turbine.
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This solicitation is for Pine Ridge Job Corps Wind Turbine Maintenance at USDA FOREST SERVICE PINE RIDGE JCC, HWY 385-15710, CHADRON NE 69337. The contract is subject to Service Contract Act WD 2015-5355. Submission of questions are due 1700 PM Eastern Time on 15 September 2026. An Amendment answering all pertinent questions will be issued by 1700 PM Eastern Time on 16 September 2026. Offers are dueno later than 1700 PM Eastern Time on 18 September 2026. Quoters are allowed to submit only one quote. The following documents are included as attachments to this solicitation. Attachment 1 Statement of WorkWind Turbine Attachment 2 Schedule of Items Attachment 3 Service Contract Act WD 2015-5355 Quotes will be at least be Evaluated on the following to points. The contractor must be qualified to service Northwind turbine systems and operate independently without direct government supervision. This needs to be proven by submission of industry accepted certificates. Will also be evaluated on, Attachment 1 Statement of Work Wind Turbine. B) Ability to meet the requirements listed: The Northwind 100 is a utility-scale wind turbine model, and all major systems drive train, blades, generators, gearboxes, hydraulics, and control systems which means they are capable of performing maintenance on this type of turbine. |
Original sector | Utilities |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Chadron |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Raw Materials, Rail, Power Generation (CCGT), Commercial, Power Transmission, Wind, Residential, Government |
Article published date | 2026-09-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Raw Materials tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Hay Cutting and Removal for Jordan Farm and Coleman Farm
- Antiscalant Chemical
- As-Needed Sewer Inspection (FY23) [BID TABULATION]
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- Sunol Valley Water Treatment Plant Ozonation
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
