logo

Yore Avenue Reconstruction

Sector: Road • Location: MITN, United States of America

Source: MITN Purchasing Group

Tender
Closed

This work consists of all labor , materials , and equipment required to maintain traffic as specified herein , on Yore Avenue , Benton Charter Township , Berrien County . b . General Requirements 1 . Traffic shall be maintained by the CONTRACTOR throughout the project in accordance with the requirements of Section 10

Status
Closed
Sector
Road, Bridge
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about Yore Avenue Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Yore Avenue Reconstruction” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This work consists of all labor , materials , and equipment required to maintain traffic as specified herein , on Yore Avenue , Benton Charter Township , Berrien County . b . General Requirements 1 . Traffic shall be maintained by the CONTRACTOR throughout the project in accordance with the requirements of Section 104 . 07 , 104 . 11 , 812 and 922 of the 2020 Michigan Department of Transportation Standard Specifications for Construction , the Michigan Manual on Uniform Traffic Control Devices ( MMUTCD ), and as specified in this proposal . 2 . The CONTRACTOR shall set up shoulder and lane closures , detours , and any other traffic control according to applicable MDOT Typical Traffic Control Drawings and the MMUTCD . All proposed traffic control plans and changes require approval from the ENGINEER prior to implementation . 3 . The Berrien County Road Department maintenance crews and / or Contract Agencies may perform maintenance work within or adjacent to the CIA . This work will be coordinated with the CONTRACTOR and the Berrien County Road Department to minimize interference . No additional payment will be made to the CONTRACTOR for joint use of traffic control items . 4 . The CONTRACTOR shall coordinate this work with other contractors performing work within the CIA or adjoining areas to avoid conflicts in the maintenance of traffic , construction signing and the orderly progress of work . The CONTRACTOR shall note Section 104 . 08 of the MDOT Standard Specifications for Construction for the requirements of cooperation with the contractors . 5 . The CONTRACTOR shall notify the ENGINEER , local police department , local fire department , and other emergency response units as least 72 hours before implementing any road closures , bridge closures , lane closures , detours or major traffic shifts . 6 . The CONTRACTOR shall furnish , erect , maintain and upon completion of the work , remove all traffic control devices and barricade lights within the construction influence area for the safety and protection of thru and local traffic . This includes , but is not limited to , advance , regulatory and warning signs , barricades , and channeling devices at the intersecting street on which traffic is to be maintained and all other traffic control devices required to maintain traffic as called for on the plans .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Bridge

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender