Z--Folsom Warehouse Bridge Crane Replacement
Sector: Hydro • Location: United States of America
Source: SAMGOVCO
The purpose of this requirement is to design, build, furnish and install one 30 ton bridge crane to replace the existing bridge crane in the Folsom Dam Warehouse. The purpose of this Amendment is to provide clarification on the SF30 from Amendment 5, Revise Proposal Instructions, Wage Determination, Request for Proposal Checklist, and provide details on the circuit breaker.
- Status
- Prospective
- Sector
- Hydro, Commercial, Residential, Bridge, Warehouse
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAMGOVCO
ConstructChat
Ask ConstructChat about Z--Folsom Warehouse Bridge Crane Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The purpose of this requirement is to design, build, furnish and install one 30 ton bridge crane to replace the existing bridge crane in the Folsom Dam Warehouse. The purpose of this Amendment is to provide clarification on the SF30 from Amendment 5, Revise Proposal Instructions, Wage Determination, Request for Proposal Checklist, and provide details on the circuit breaker. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAMGOVCO |
URL |
More Details
Record type | Tender |
Sector | Hydro, Commercial, Residential, Bridge, Warehouse |
Article published date | 2026-10-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
