Z--Wy Ccc Ups & Breaker Replacement
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
(see attachment for full documentation of synopsis) The Bureau of Reclamation Wyoming Area Office (WYAO) has a need to update the office building’s Uninterruptible Power Supply (UPS) and Downstream Panels. This is a project to replace the Automatic Transfer Switch (ATS) and UPS in Wyoming Supervisory Control Building and replace other minor, outdated equipment. Major components of the work include
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Commercial, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Z--Wy Ccc Ups & Breaker Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | (see attachment for full documentation of synopsis) The Bureau of Reclamation Wyoming Area Office (WYAO) has a need to update the office building’s Uninterruptible Power Supply (UPS) and Downstream Panels. This is a project to replace the Automatic Transfer Switch (ATS) and UPS in Wyoming Supervisory Control Building and replace other minor, outdated equipment. Major components of the work include: 1. Replacing enclosed circuit breakers MPN and MPG. 2. Replacing service entrance transfer switch MTS with service entrance Auto Transfer Switch. 3. Removing transfer switch ATS and ATS2. 4. Removing and replacing UPS1 and UPS2. 5. Removing battery charger BCA and safety disconnect switch BCD. 6. Removing bypass transformers KBB, KBA and enclosed circuit breakers XA and XB. 7. Replacing panelboard CPP1, CPP2 and PPAA. 8. Minor low voltage cable replacement. 9. Testing and commissioning installed electrical equipment. During the course of the project the contractor will be held to multiple institutional performance standards outlined in the specifications document in order to ensure safe and effective construction and quality products supplied. Work is located 705 Pendell Blvd, Mills WY 82644, Natrona County. It is anticipated that this will be a total small business set-aside acquisition. This notice is issued under FAR 36.101-4 (RFO) and FAR Subpart 5.2 (RFO). It is not a request for proposals. The complete solicitation will be posted exclusively on SAM.gov and will not be distributed via mail, fax, or in hard copy. Anticipated post date is around the first part of May 2026. All qualified and responsible sources are invited to submit proposals during the solicitation phase, and each submission will receive full consideration by the agency. Offerors must be registered in SAM.gov with valid UEI. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Power Generation (CCGT), Commercial, Residential |
Article published date | 2026-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...
