Z1DA -- Construction Project 626A4 - 22 - 104 Video Surveillance Security TN Valley Heatlhcare System ( TVHS ) Alvin C . York Campus
Bids closed May 2026 · Tennessee · Last reported Apr 2026
Source: Tennessee Purchasing Group
Sources Sought Notice Page 5 of 6 Sources Sought Notice DESCRIPTION The Alvin C . York Campus TVHS security monitoring system requires an upgrade to include new camera equipment and locations , headend equipment and upgrades to the existing monitoring station . This effort includes the removal and replacement
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Telecommunications, Manufacturing (Industrial), Car parking, Commercial, Cement, Automotive, Residential, Hospital, Road
- Location
- Tennessee, United States of America
- Updated
- 3 Nov 2026
- Source
- Tennessee Purchasing Group
ConstructChat
Ask ConstructChat about Z1DA -- Construction Project 626A4 - 22 - 104 Video Surveillance Security TN Valley Heatlhcare System ( TVHS ) Alvin C . York Campus
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Sources Sought Notice Page 5 of 6 Sources Sought Notice DESCRIPTION The Alvin C . York Campus TVHS security monitoring system requires an upgrade to include new camera equipment and locations , headend equipment and upgrades to the existing monitoring station . This effort includes the removal and replacement of outdated or inoperable field equipment , installation of new cameras , network video recorders ( NVRs ), display systems , communication components , and associated infrastructure necessary to support a fully integrated and modernized surveillance platform . The upgraded system will incorporate advanced capabilities , including artificial intelligence ( AI )- enabled video analytics , to enhance monitoring , detection , and response capabilities across the campus . Work is to include demolition and new construction , including , but not limited to general construction , civil , architectural , electrical , low voltage , industrial hygiene , and certain other items . This project consists of furnishing all supervision , labor , materials , equipment , and transportation . It also consists of performing all work in strict accordance with the applicable specifications and drawings that form the parts thereof . This project has a set of drawings and specifications that have been created by an Architectural - Engineering firm . These drawings and specifications indicate the work to be performed at TN Valley Healthcare System VAMC . Integration with the existing infrastructure requires that this project includes a brand name specification for Avigilon systems and equipment . Contractors must provide documentation demonstrating their authorization to install , service , or work on Avigilon systems to be considered acceptable . Title : 626 - 22 - 103_Video Surveillance Security Number : 36C24926R0065 Set Aside : TBD Classification Code : Z1DA Maintenance of Hospitals and Infirmaries NAICS Code : 238210 Electrical Contractors and Other Wiring Installation Contractors Size Standard : $ 19 Million . Synopsis : Please note that this is NOT a request for quotes or proposals , the Government is seeking information for market research purposes only . The Government may or may not issue solicitation documents . The Department of Veterans Affairs Network Contracting Office ( NCO ) 9 is conducting a market survey for qualified : Seeking for ALL available sources to determine all set aside options , capable of providing the required services outlined below for the TVHS Alvin C . York Campus VAMC , Murfreesboro , TN . Responses to this notice must be submitted via e - mail and received no later than May 1 , 2026 , at 10 : 00 AM Central Time . No telephone inquiries will be accepted or returned . Additional information about this project will be issued on the Federal Contract Opportunities website https :// www . sam . gov once available . Period of Performance for all work is 270 calendar days . The estimated cost magnitude is between $ 1 , 000 , 000 . 00 and $ 5 , 000 , 000 . 00 Prospective SDVOSB firms are reminded that in accordance with Revolutionary Federal Acquisition Regulation Overhaul ( RFO ) 52 . 219 - 14 ( e )( 3 ), the Contractor agrees it will not pay more than 85 percent of the amount paid by the Government for contract performance , excluding the cost of materials , to subcontractors that are not similarly situated entities . Any work that a similarly situated entity further subcontracts will count towards the prime contractor ' s 85 percent subcontract amount that cannot be exceeded . Interested firms must be registered in https :// sam . gov with NAICS code 238210 and qualified as a Service Disabled Veteran Owned small business under 238210 Commercial and Institutional Building Construction . Qualified service - disabled veteran owned small businesses are encouraged to respond and required to be registered in with the Small Business Administration ( SBA ) registry https :// certifications . sba . gov / on or before the response date . If interested in this opportunity , please provide Capability Statement via email . The Capability Statement is designed to inform the Department of Veteran Affairs of any prospective construction contractors ' project execution capabilities . The submission is limited to 10 pages which shall include the following information : 1 ) Offeror ' s name , address , point of contact , phone number , e - mail address , and Unique Entity ID . 2 ) Offeror ' s interest in bidding on the solicitation when it is issued . 3 ) Offeror ' s capability to perform a contract of this magnitude and complexity and comparable work performed within the past 5 years - brief description of the project , customer name , timeliness of performance , customer satisfaction , and dollar value of the project - provide at least 1 , but no more than 3 completed construction examples . 4 ) Offeror ' s CVE certification as a Veteran owned business . 5 ) Please provide Socio - economic status for NAICS code 236220 Commercial and Institutional Building Construction and provide percentage of self - performed labor your company can perform for this type of project . 6 ) Offeror ' s Joint Venture information if applicable - existing and potential . 7 ) Offeror ' s Bonding Capability in the form of a letter from Surety providing bonding level per contract and aggregate . No basis for claim against the Government shall arise as a result of a response to this sources sought or Government use of any information provided . The Government will not pay for information or comments provided and will not recognize any costs associated with submission of comments . There is no guarantee , expressed or implicit , that market research for this acquisition will result in a particular set - aside , or any other guarantee of award or acquisition strategy . Responses must be received by 10 : 00 AM Central on May 1 , 2026 , via e - mail to the Contracting Officer at Jeannette . Morphew @ va . gov and Contract Specialist Lara . Hampton @ va . gov PLEASE REFERENCE " SOURCES SOUGHT : 626 - 22 - 103 Video Surveillance Security Nashville IN THE SUBJECT LINE and cover sheet . Respondents will not be contacted regarding their submission or information gathered as a result of this Sources Sought notice . Interested firms shall be required to respond to additional announcements separately from this announcement without further notice from the Government when posted to the Contract Opportunities website at https :// sam . gov . The Contract Opportunities website is the only official site to obtain these documents . 626A4 - 22 - 104 VIDEO SURVEILLANCE TVHS Alvin C . York CAMPUS Page 1 of 5 Page 1 of Page 6 of 6 Page 1 of 5 Page 1 of STATEMENT OF WORK GENERAL INFORMATION Title of Project : Project # 626A4 - 22 - 104 Video Surveillance York Scope of Work : The contractor shall furnish all labor , material , equipment and supervision necessary to accomplish the work for Project # 626A4 - 22 - 104 Video Surveillance York at the Tennessee Valley Healthcare System , VA Medical Center , 3400 Lebanon Road , Murfreesboro , TN 37129 in accordance with the specifications and drawings . Work includes demolition and new construction , including , but not limited to general construction , civil , architectural , electrical , low voltage , industrial hygiene , and certain other items . Statement Of Bid Item ( S ) BID ITEM I : Work includes general construction , alterations , improvements , necessary removal of existing structures and construction and certain other items . POP 365 Days BID ITEM II : All items included in BID ITEM I except the 5th floor work . POP 330 Days BID ITEM III : All items included in BID ITEM II except the 4th floor work . POP 315 Days BID ITEM IV : All items included in BID ITEM III except the 3rd floor work . POP 300 Days GENERAL REQUIREMENTS All work , including materials , shall have a one - year warranty , or as noted in project specifications . Elements of the project that require a warranty beyond one year : Technology products to be warrantied for 3 years . Medical Center normal working hours are Monday thru Friday from 6 a . m . to 2 : 30 p . m . On - site work time shall be managed to minimize the effect on the medical center . Portions of work that require shutdowns , noise , vibration or interruption of adjacent service operations will be performed from 5 : 00 a . m . to 7 : 00 a . m . and 5 : 00 p . m . to midnight . On weekends the work can be performed between 6 : 00 p . m . Friday to 9 : 00 p . m . Sunday . The contractor will be required to work nights and weekends to complete the work , in order to maintain the functionality of affected areas and to minimize disruptions to the Medical Centers operations . Before evening and weekend work begins , the project schedule shall be submitted by the contractor and approved by the VA COR one week before the work taking place . The contractor will coordinate all work in advance with VA COR . The contractor superintendent will always be on - site during the performance of the work associated with this contract . When using furnish , provide , install , or similar term is used regarding all labor , materials , and equipment to perform the job it shall mean a complete installation that is ready for use . No existing operational cameras can be removed until the replacement camera is operational and installation is signed off by COR / Fiscal Security . All old cameras / devices to be turned over to the COR / Fiscal Security Office . All of the following items are to be provided by contractor . New Cisco 9300 POE ( CAT 6A color TBD by COR ) switches are to be provided to connect to all existing and new cameras in various telecom rooms located throughout the facility . Each telecom room to be equipped with a new patch panel ( s ). A new power distribution unit ( PDU ) will be added to each telecom room as to power rack mounted equipment . New duplex receptacles will be added to power added to power the new equipment for the security monitoring equipment . The circuit will be fed from the panel located in the telecom room . New Avigilon rack NVR and associated equipment will be installed in a room that will be coordinated with VA to provide recording and monitoring . The NVR is to provide a minimum of 30 days of backup with the option of 60 days as determined by the VA . NVR will be connected to telecommunications rooms through new fiber cabling via spare multimode fiber connection . All new work in telecom rooms to be coordinated with COR / OIT . The contractor shall identify all employees that will be working under the awarded contract . The contractor personnel shall include employees , sub - contractors , suppliers , and delivery personnel entering the medical center . Those employees shall bring one photo ID and the second form of state / federally issued id to obtain a VA Contractor identification badge ( REAL ID is required as one source of ID ). A Passport or Social Security Card will suffice as the second form of ID . This badge must always be worn above the belt while on medical center property . The contractor s employees shall return all I . D . badges to designated personnel at the end of the period of performance of the contract . Lost badges will result in a surcharge . The contractor ' s safety manager is responsible for safety inspections of all contract operations and will be identified to the contractor . All VA and OSHA safety regulations shall be observed during the performance of work identified on this contract . Provide signage and barricades , as required , to maintain safety and protection of work around the project work site . Daily safety reports shall be provided to the COR daily . Additionally , on - site workers are screened daily at facility entrances prior to work . The contractor shall visit the job site to thoroughly familiarize themselves with all the details of this work and working conditions . The contractor shall also verify all dimensions in the field and shall advise the CO and COR of any discrepancy before performing any work . The contractor shall be responsible for the coordination and proper relation of his work to the building , structure , phasing , ensuring the safety of employees , and workmen . The contractor shall not allow smoking in any building or vehicle ( located on VA property ) and shall ensure employees do not smoke on VA property . This is a smoke free facility . Violation of VA directive will result in a Federal Fine . The contractor will take adequate precautions to protect all adjacent equipment , concrete pads , and walkways in the work area from spills , drips , runs , and damage from the use of power tools . The general contractor will be provided with two parking spaces ( additional drivers of the general contractor will be issued a parking violation ticket ). All others related to the project can utilize other paid parking lots / garages located off campus . The government isn t responsible for additional parking . Drivers should be particularly concerned with pedestrian traffic and yield to pedestrians . Seat Belt use is mandatory on all VA grounds . The Contractor shall always keep the work area area ( s ) free from the accumulation of waste materials . The Contractor shall remove from the work and premises any rubbish , tools , scaffolding , equipment , and materials that are not the property of the Government . This includes the area outside of the building . If materials are stored on - site they shall be organized and inside a conditioned storage space . A messy work area is dangerous ; the COR has the authority to request that the site be cleaned in lieu of proceeding with work . The government is not providing storage space . Material in storage but not yet installed can not be invoiced to the project . Equipment ( building service equipment and systems ) shall be provided by nationally recognized manufacturers that produce and distribute equipment / products across the United States for over 5 years . Manufacturers must have local vender representation . Materials for this project must be sourced from the USA , materials submitted from other countries will not be accepted . When fixture / devices are being removed , remove all appurtenances related or connected to the items being removed or demolished . Utilities shall be removed back to the source or active main / branch . Do not leave any abandoned utilities / lines or dead - end lines . Final verification required by COR before covering up connection . The type of controls throughout project work shall be consistent . Controls must be of the same manufacturer and type . Our building automation system is structured around Siemens and any new components shall be Bacnet compatible with existing systems and ongoing service contracts . ( Alternate version ) The type of controls throughout the project work shall be consistent . Contractor must utilize existing BAS infrastructure when tying in all controls . Due to space limitations , the contractor will only be provided with one location for staging ( one small conex and one small dumpster ). For equipment / material that is no longer needed and / or waste , the contractor is responsible for proper and daily removal . Staging area location will be determined by the COR . No material is to be stored outside . If material is found to be stored outside of a conditioned location the COR has the right to request that the material be replaced with new material . There is only one final project inspection , and it will take place at the end of the project , The contractor shall request a final inspection two weeks after providing a certified inspection report ( s ) ( in writing ), and a copy of their completed and corrected QA inspection . At the time of the request there shall be no incomplete work . There are additional inspections required while the work progresses but only one final inspection . All penetrations through ceilings , floors , pipe chases , fire walls , and smoke barriers , and ceiling tiles etc are required to be appropriately sealed by a certified fire stop installer ( credentials to be provided to the COR ) to maintain NFTA 101 and Joint Commission compliance . Penetrations need to be sealed at the end of the work day and / or before leaving the area of work . For continuity with existing firestop systems ; Hilti brand products should be utilized . Burn permits are required at this facility on a daily basis . Neglecting to use the form may result in the removal of violators from the campus . Safety is no accident ; OSHA standards are to be met at this facility . Periodic safety reviews are made of the site multiply times each week . Violations may result in the removal of violators from the campus and repeat violations may result in additional enforcement from FED OSHA . See specifications for additional requirements . Encloser ( 1 ) Hot Work Permit Encloser ( 2 ) Fire Wall / Smoke Barrier Penetration Permit ( End of Statement of Work ) |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | Tennessee Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Government, Telecommunications, Manufacturing (Industrial), Car parking, Commercial, Cement, Automotive, Residential, Hospital, Road |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
