Z1Da--36C242-26-Ap-0767 | 528-26-1-8386-0003 528A8-22-851 Upgrade Bms Network Construction (Va-26-00016299)
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
FYI Submission from AE for 528A8-22-851 Upgrade VA Albany BMS Backbone The project specs do not indicate a fiber type or strand count for new cabling, please clarify. Response: See attached spec section 27 15 00 COMMUNICATIONS STRUCTURED CABLING. 2/1-DA-102: The drawings imply no ceiling, but the field condition is plaster and lathe. Please confirm if this is to be demolished. Response: The existi
- Status
- Closed
- Sector
- Telecommunications, Commercial, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Z1Da--36C242-26-Ap-0767 | 528-26-1-8386-0003 528A8-22-851 Upgrade Bms Network Construction (Va-26-00016299)
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | FYI Submission from AE for 528A8-22-851 Upgrade VA Albany BMS Backbone The project specs do not indicate a fiber type or strand count for new cabling, please clarify. Response: See attached spec section 27 15 00 COMMUNICATIONS STRUCTURED CABLING. 2/1-DA-102: The drawings imply no ceiling, but the field condition is plaster and lathe. Please confirm if this is to be demolished. Response: The existing plaster and lathe ceiling shall remain. In spaces with plaster and lathe ceiling, install new conduits and devices below ceiling. Dumbwaiter Vestibules: We suspect double ceilings, original plaster and lathe above the visible drop ceilings in these rooms. Please confirm if present. Response: When Fellenzer was on-site we checked above the 6th and 9th floor ACT and found no plaster layer above those ceilings. Fellenzer did not check floors 2-5, 7-8, or 10. Given the plaster and lathe in 2/1-DA-102 area and potentially above the vestibule drop ceilings, please advise if any testing has been performed for lead or asbestos. Response: Assume plaster and lathe to have ACM and lead. Contractor shall include hazardous material testing and abatement in the bid price. If ACM is not found in certain areas, credit back to owner for abatement of those areas. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Telecommunications, Commercial, Residential |
Article published date | 2026-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender