Z1Da--612A4-19-016 | Renovate Outpatient Pharmacy And Hvac

Sector: Government • Location: United States of America

Source: SAM.gov

Tender
Solicitation

AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. CONTINUATION PAGE 2 SOLICITATION NO: 36C26126R0036 ORDER NO: AMENDMENT NO: 0005 14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED) The purpose of this amendment is to answer three additional RFIs. Section 01 00 00 requires the project schedule to include a minimum of forty-five (45) days for VAÂ relocation of Pharmacy Services into the

Status
Closed
Sector
Government, Residential, Commercial
Location
United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Z1Da--612A4-19-016 | Renovate Outpatient Pharmacy And Hvac

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Z1Da--612A4-19-016 | Renovate Outpatient Pharmacy And Hvac” is a tender record in Taiyo, linked to the Government sector. It is issued for works, goods, or services related to United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. CONTINUATION PAGE 2 SOLICITATION NO: 36C26126R0036 ORDER NO: AMENDMENT NO: 0005 14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED) The purpose of this amendment is to answer three additional RFIs. Section 01 00 00 requires the project schedule to include a minimum of forty-five (45) days for VAÂ relocation of Pharmacy Services into the completed temporary facilities, and a minimum of forty-five (45) days for VA relocation of staff, equipment, and operations from the temporary facilities back into Building 650 upon completion of the renovated outpatient pharmacy suite. Please confirm: (a) whether both 45-day VA relocation periods are included within the 540-calendar-day period of performance; and (b) whether contract completion for purposes of the period of performance is measured at Government acceptance of the renovated pharmacy suite, or upon completion of temporary facility removal and complete site restoration following the VA's 45-day relocation back into Building 650. ANSWER: The 540-calendar-day Contract Time includes both 45-calendar-day VA relocation periods. Contract completion is achieved upon completion of all Contract Work, including removal of the temporary facilities and complete site restoration following the VA's final relocation back into Building 650. "Construction start date" refers to commencement of on-site construction activities, including temporary facility construction. This requirement applies to construction-phase submittals required to perform the Work and does not include closeout submittals (e.g., O&M manuals, as-built drawings) or finish selections not required before installation. Section 01 00 00 states: 100% of ALL project submittals shall be approved prior to the construction start date. Please clarify whether construction start date refers to (a) commencement of temporary facility construction, or (b) commencement of renovation work within Building 650. Please also confirm whether closeout-phase submittals (e.g., O&M manuals, as-built drawings) and late-phase finish material submittals are included in this requirement, or whether it applies to construction-phase submittals only. GLBA appreciates the Government's attention to these questions and remains available for any clarification needed. ANSWER: "Construction start date" refers to commencement of on-site construction activities, including temporary facility construction. This requirement applies to construction-phase submittals required to perform the Work and does not include closeout submittals (e.g., O&M manuals, as-built drawings) or finish selections not required before installation. One of our drywall trade partners has brought up a conflict they have found on the existing walls at the perimeter of the pharmacy. Per wall type Mbb3 on Sheet A-501 at the corridor it appears that the framing is existing and one new layer of board, the security mesh fire safing and a closure angle is required to be installed. How we would install the 3 slip track at an existing wall? Are they to be cut between the existing studs and fastened to the bottom of the roof deck? Please advise if the slip track is needed. ANSWER: Install the head-of-wall/slip-track assembly at the existing wall by attaching the slip track to the structure above as required to maintain the specified assembly. Existing studs are not required to be removed or modified except as necessary to complete the installation. ///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////

Original sector

Construction

Location

Country

United States of America (USA)

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Government, Residential, Commercial

Article published date

2026-09-04

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender