OPPORTUNITIES DESCRIPTION Construction Service for Project No. 593-22-350, Improve Central Utility Plant at VA Medical Center Las Vegas, NV. This is a pre-solicitation announcement only. Solicitation documents will be available on or around January 7, 2026. The solicitation will contain all necessary proposal instructions. This requirement is a total set-aside for a Service Disabled Veteran Owned

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Oil and Gas, Road, Residential, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Metal, Steel, Hospital
Location
N. Las Vegas, Nevada, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Z1Da--Improve Central Utility Plant Vamc Las Vegas, Nv Project 593-22-350

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Z1Da--Improve Central Utility Plant Vamc Las Vegas, Nv Project 593-22-350” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to N. Las Vegas, Nevada, United States of America.

Participants

Not available for this record.

Status

Original status

presolicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

OPPORTUNITIES DESCRIPTION Construction Service for Project No. 593-22-350, Improve Central Utility Plant at VA Medical Center Las Vegas, NV. This is a pre-solicitation announcement only. Solicitation documents will be available on or around January 7, 2026. The solicitation will contain all necessary proposal instructions. This requirement is a total set-aside for a Service Disabled Veteran Owned Business (SDVOSB). The applicable North American Industry Classification System (NAICS) Code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $45M. In Accordance With (IAW) VA Acquisition Regulation (VAAR) 836.204(g) Disclosure of the magnitude of construction projects is anticipated between $5,000,000.00 and $10,000,000.00. Questions regarding this pre-solicitation must be sent in writing to christopher.whipple@va.gov Project Purpose: The purpose of this project is to perform the following: Equipment Replacement, Modification, and Integration: The GC shall make themselves intimately familiar with full scope as defined in this scope of work, construction drawings, and specifications. This work includes but is not limited to: Replacement of the heat recovery system in the boiler room. Replace the existing water softener copper piping with new stainless steel piping and add polisher for a redundant system. Reconfigure the non-return valve at the top of boiler #3 into a horizontal configuration. Replace the existing corroded condensate return/surge tank with a new stainless steel tank. Extend/connect catwalk above boiler room for access to air handlers. Replace windows with operable louvers in Boiler room above overhead door (interlock to close with fire alarm activation). Automate back-up pumps located in Building 5 basement Controls in Building 2 boiler room and connect to existing BMS/JCI system for controlling and status display. Automate fuel oil system located in Building 3 and locate controls in Building 2 boiler room. Integrate fuel tank system to Hayz Cleveland controls in Building 2 boiler room (9 tanks total only 4 tanks are currently showing on the system). Separate 2 of the 5 condenser pumps onto their own dedicated power source bank (MCC). Replace 5 existing condenser pumps with high efficiency double impeller or raise the cooling towers and extend screen wall around cooling tower yard. The A/E shall determine the best solution. Install secondary water supply to cooling towers from 10 waterline at east side of CUP. Upgrade facility-wide Lutron lighting controls as needed for single point monitoring in CUP control room. Add ladders/stairs and extend catwalks in chiller room for improved access to serviceable equipment. Replace (5) failing existing cooling tower Variable Frequency Drives (VFD) with new like-for-like. Replace (5) failing existing chilled water pump VFDs with new like-for-like Replace (5) existing chilled water pumps with new high efficiency domestically sourced pumps with readily available domestic parts to match the new condenser pumps. Replace (3) failing existing industrial Water pump VFDs with new like-for-like Replace (3) existing industrial water pumps with new like-for-like. Offerors are strongly urged to attend the site visit prior to submitting their proposals to evaluate the extent of the project requirements. The period of performance for this project is 360 calendar days from when the notice to proceed (NTP) is issued. The work will be accomplished at VAMC Las Vegas, located at 6900 North Pecos Road, North Las Vegas, NV 89086. (END OF OPPORTUNITIES DESCRIPTION)

Original sector

Construction

Location

Country

United States of America (USA)

State

Nevada

City

N. Las Vegas

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Power Transmission, Oil and Gas, Road, Residential, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Metal, Steel, Hospital

Article published date

2025-11-20

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender